Journal Article |
File Downloads |
Abstract Views |
Last month |
3 months |
12 months |
Total |
Last month |
3 months |
12 months |
Total |
A multi-start randomized heuristic for real-life crew rostering problems in airlines with work-balancing goals |
1 |
3 |
13 |
29 |
1 |
3 |
18 |
67 |
Assessing the Distribution of Elderly Requiring Care: A Case Study on the Residents in Barcelona and the Impact of COVID-19 |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
2 |
Benefits of robust multiobjective optimization for flexible automotive assembly line balancing |
0 |
0 |
0 |
3 |
1 |
1 |
2 |
32 |
Correction: Juan, A.A.; Mendez, C.A.; Faulin, J.; de Armas, J.; Grasman, S.E. Electric Vehicles in Logistics and Transportation: A Survey on Emerging Environmental, Strategic, and Operational Challenges. Energies 2016, 9, 86 |
0 |
0 |
0 |
1 |
0 |
0 |
0 |
55 |
Electric Vehicles in Logistics and Transportation: A Survey on Emerging Environmental, Strategic, and Operational Challenges |
0 |
0 |
1 |
10 |
1 |
6 |
14 |
118 |
Health Care Needs and Services for Elder and Disabled Population: Findings from a Barcelona Study |
0 |
0 |
0 |
0 |
1 |
2 |
2 |
2 |
Impact of Socioeconomic Environment on Home Social Care Service Demand and Dependent Users |
0 |
0 |
0 |
0 |
1 |
1 |
1 |
2 |
Impact of quality of service in the direct cost of integrated home care services |
0 |
1 |
1 |
1 |
0 |
2 |
2 |
2 |
Improving the accessibility to public schools in urban areas of developing countries through a location model and an analytical framework |
0 |
0 |
1 |
1 |
0 |
0 |
1 |
1 |
Improving the efficiency of a best-first bottom-up approach for the Constrained 2D Cutting Problem |
0 |
0 |
0 |
6 |
0 |
1 |
1 |
27 |
Migrating Birds Optimization for the Seaside Problems at Maritime Container Terminals |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
5 |
Optimization of the Real-Time Response to Roadside Incidents through Heuristic and Linear Programming |
0 |
0 |
0 |
2 |
1 |
1 |
1 |
5 |
Optimizing Assistive Technology Operations for Aging Populations |
0 |
0 |
0 |
1 |
0 |
1 |
3 |
9 |
Parallel machine, capacitated lot-sizing and scheduling for the pipe-insulation industry |
0 |
0 |
1 |
4 |
0 |
1 |
2 |
14 |
Solving large-scale time capacitated arc routing problems: from real-time heuristics to metaheuristics |
2 |
2 |
2 |
24 |
3 |
4 |
6 |
67 |
Solving the deterministic and stochastic uncapacitated facility location problem: from a heuristic to a simheuristic |
0 |
0 |
1 |
13 |
0 |
0 |
6 |
71 |
Total Journal Articles |
3 |
6 |
20 |
95 |
9 |
23 |
60 |
479 |