Access Statistics for Dennis Huisman

Author contact details at EconPapers.

Working Paper File Downloads Abstract Views
Last month 3 months 12 months Total Last month 3 months 12 months Total
A Branch-and-Price Approach for a Ship Routing Problem with Multiple Products and Inventory Constraints 0 0 0 24 2 4 8 80
A Column Generation Approach for Locating Roadside Clinics in Africa based upon Effectiveness and Equity 0 0 0 12 2 2 5 55
A Column Generation Approach for the Integrated Crew Re-Planning Problem 0 0 0 9 0 5 5 38
A Lagrangian Relaxation Approach Based on a Time-Space-State Network for Railway Crew Scheduling 0 0 0 26 2 7 11 87
A Next Step in Disruption Management: Combining Operations Research and Complexity Science 0 0 0 19 2 4 7 92
A Quasi-Robust Optimization Approach for Resource Rescheduling 0 0 1 20 0 0 2 69
A Self-Organizing Policy for Vehicle Dispatching in Public Transit Systems with Multiple Lines 0 0 0 9 0 2 2 22
A Variable Neighborhood Search Heuristic for Rolling Stock Rescheduling 0 0 1 13 0 3 5 23
A column generation approach to solve the crew re-scheduling problem 0 1 1 51 3 8 8 158
A dynamic approach to vehicle scheduling 0 0 0 335 1 1 2 937
A good or a bad timetable: Do different evaluation functions agree? 0 0 0 1 0 1 2 25
A heuristic for real-time crew rescheduling during small disruptions 0 0 0 22 2 2 4 61
A solution approach for dynamic vehicle and crew scheduling 0 0 0 22 1 2 2 96
Algorithmic Support for Disruption Management at Netherlands Railways 0 0 0 20 0 2 5 60
Algorithmic Support for Railway Disruption Management 0 0 0 26 0 2 2 78
An Iterative Framework for Real-time Railway Rescheduling 0 0 0 10 0 1 2 37
An Iterative Optimization Framework for Delay Management and Train Scheduling 0 0 0 24 2 3 3 84
An Overview of Recovery Models for Real-time Railway Rescheduling 0 1 3 96 0 4 7 248
An iterative heuristic for passenger-centric train timetabling with integrated adaption times 0 0 0 7 2 5 10 38
Analyzing a Family of Formulations for Cyclic Crew Rostering 0 0 0 5 0 0 0 19
Applying an Integrated Approach to Vehicle and Crew Scheduling in Practice 0 0 0 219 2 2 2 864
Column generation with dynamic duty selection for railway crew rescheduling 0 0 0 37 0 5 7 128
Combining Column Generation and Lagrangian Relaxation 0 0 0 408 1 6 6 1,055
Comparison of heuristic approaches for the multiple depot vehicle scheduling problem 0 0 0 34 4 5 6 143
Decision support for crew rostering at NS 0 0 0 12 0 0 0 69
Delay Management including Capacities of Stations 0 0 1 22 0 0 1 78
Delay Management with Re-Routing of Passengers 0 0 0 20 1 2 2 94
Demand-Driven Scheduling of Movies in a Multiplex 0 0 0 96 1 4 5 345
Demand-driven scheduling of movies in a multiplex 0 0 0 27 0 0 1 131
Design of a robust railway line system for severe winter conditions in The Netherlands 0 0 0 8 1 1 3 26
Determining and Evaluating Alternative Line Plans in (Near) Out-of-Control Situations 0 1 1 5 0 1 1 24
Disruption management in passenger railway transportation 0 0 0 105 1 3 3 331
Fast Heuristics for Delay Management with Passenger Rerouting 0 0 0 19 0 0 1 61
Good, Better, Best! About Optimization in Public Transport 0 0 0 0 0 1 1 7
Integrating Timetabling and Crew 0 0 0 26 1 3 3 94
Is Equality always desirable? 0 0 0 9 3 6 7 45
Modeling and solving line planning with integrated mode choice 0 0 0 2 1 2 5 22
Models and algorithms for Integration of Vehicle and Crew Scheduling 0 0 0 346 0 1 2 892
Multiple-Depot Integrated Vehicle and Crew Scheduling 0 0 0 22 2 3 5 77
Operations Research in Passenger Railway Transportation 0 0 0 486 3 5 6 1,485
Operations research in passenger railway transportation 0 0 0 113 2 4 4 436
Railway Crew Rescheduling with Retiming 0 0 0 28 1 2 5 97
Railway timetabling from an operations research 0 1 1 49 2 3 6 138
Re-scheduling in railways: the rolling stock balancing problem 0 1 2 32 2 6 10 134
Reducing Passenger Delays by Rolling Stock Rescheduling 0 0 0 14 1 2 3 53
Reducing Passenger Delays by Rolling Stock Rescheduling 0 0 0 7 4 4 7 35
Scheduling Movements in the Network of an Express Service Provider 0 0 0 19 3 6 6 88
Scheduling preventive railway maintenance activities 0 0 0 93 1 3 3 293
Shunting of Passenger Train Units in a Railway Station 0 1 2 195 0 2 8 847
Solution Approaches for Vehicle and Crew Scheduling with Electric Buses 0 0 1 37 3 4 9 92
Solving Large Scale Crew Scheduling Problems in Practice 0 0 0 33 1 2 4 100
The Vehicle Rescheduling Problem with Retiming 0 0 0 22 1 1 2 46
The new Dutch timetable: The OR revolution 0 0 0 49 1 2 4 201
Timetabling for strategic passenger railway planning 0 0 0 12 2 3 5 29
Vehicle and crew scheduling: solving large real-world instances with an integrated approach 0 0 0 20 2 3 4 90
Total Working Papers 0 6 14 3,377 66 155 239 10,957


Journal Article File Downloads Abstract Views
Last month 3 months 12 months Total Last month 3 months 12 months Total
A column generation approach for the rail crew re-scheduling problem 0 0 0 41 2 6 7 132
A solution approach for dynamic vehicle and crew scheduling 0 0 0 22 2 3 3 76
Operations Research in passenger railway transportation 0 0 0 79 2 4 8 322
Total Journal Articles 0 0 0 142 6 13 18 530


Statistics updated 2026-01-09