| Working Paper |
File Downloads |
Abstract Views |
| Last month |
3 months |
12 months |
Total |
Last month |
3 months |
12 months |
Total |
| A Nuclear Future? UK Government Policy and the Role of the Market |
0 |
0 |
0 |
3 |
1 |
1 |
2 |
14 |
| A Nuclear Future? UK Government Policy and the Role of the Market? |
0 |
0 |
0 |
136 |
5 |
6 |
6 |
233 |
| A Review of the Monitoring of Market Power The Possible Roles of TSOs in Monitoring for Market Power Issues in Congested Transmission Systems |
1 |
2 |
8 |
795 |
4 |
9 |
31 |
1,955 |
| A Review of the Monitoring of Market Power: The Possible Roles of TSOs in Monitoring for Market Power Issues in Congested Transmission Systems |
0 |
0 |
0 |
245 |
4 |
5 |
6 |
699 |
| A Template for Power Reform |
0 |
0 |
0 |
4 |
2 |
2 |
3 |
23 |
| A Unit Commitment and Economic Dispatch Model of the GB Electricity Market – Formulation and Application to Hydro Pumped Storage |
0 |
0 |
0 |
25 |
1 |
4 |
8 |
80 |
| A Unit Commitment and Economic Dispatch Model of the GB Electricity Market – Formulation and Application to Hydro Pumped Storage |
0 |
0 |
1 |
11 |
2 |
5 |
12 |
43 |
| A simple introduction to the economics of storage: shifting demand and supply over time and space |
0 |
0 |
1 |
35 |
4 |
7 |
10 |
118 |
| A simple introduction to the economics of storage: shifting demand and supply over time and space |
0 |
0 |
1 |
16 |
1 |
3 |
8 |
44 |
| Acid Rain |
0 |
0 |
0 |
398 |
2 |
3 |
8 |
2,831 |
| Allocating Transmission to Mitigate Market Power in Electricity Networks |
0 |
0 |
0 |
3 |
3 |
4 |
5 |
20 |
| Allocating Transmission to Mitigate Market Power in Electricity Networks |
0 |
0 |
0 |
395 |
2 |
4 |
4 |
902 |
| Alternative instruments for smoothing the consumption of primary commodity exporters |
0 |
0 |
0 |
73 |
2 |
5 |
5 |
348 |
| An Analysis of the Hungarian Tax Reform |
0 |
0 |
0 |
111 |
1 |
2 |
2 |
485 |
| An Analysis of the Importance of the Malleable Capital Assumption in Optimal Growth Models |
0 |
0 |
0 |
22 |
0 |
0 |
0 |
273 |
| Analytic Solutions for Supply Function Equilibria: Uniqueness and Stability |
0 |
0 |
0 |
93 |
2 |
4 |
8 |
323 |
| Analytic Solutions for Supply Function Equilibria: Uniqueness and Stability |
0 |
0 |
0 |
1 |
1 |
3 |
3 |
15 |
| Auctions and trading in energy markets - an economic analysis |
0 |
0 |
0 |
7 |
0 |
1 |
2 |
30 |
| Auctions and trading in energy markets -- an economic analysis |
0 |
0 |
0 |
951 |
2 |
3 |
6 |
1,925 |
| Calculating The Social Cost Of Carbon |
0 |
0 |
0 |
293 |
5 |
7 |
9 |
887 |
| Calculating the social cost of carbon |
0 |
0 |
0 |
14 |
0 |
1 |
2 |
85 |
| Capacity-Constrained Supply Function Equilibria: Competition and Entry in the Electricity Spot Market and Competition and Regulation in English Electricity Industry |
0 |
0 |
0 |
0 |
0 |
1 |
6 |
953 |
| Climate Change Policy and its Effect on Market Power in the Gas Market |
0 |
0 |
0 |
1 |
0 |
1 |
3 |
20 |
| Climate change policy and its effect on market power in the gas market |
0 |
0 |
0 |
200 |
3 |
5 |
6 |
492 |
| Club goods and a tragedy of the commons: the Clean Energy Package and wind curtailment |
0 |
0 |
2 |
39 |
2 |
6 |
11 |
117 |
| Club goods and a tragedy of the commons: the Clean Energy Package and wind curtailment |
0 |
0 |
0 |
11 |
0 |
0 |
4 |
17 |
| Commodity Bonds for Smoothing the Consumption of Primary Commodity Exporters |
0 |
0 |
0 |
3 |
0 |
0 |
5 |
41 |
| Commodity Bonds with Put Options for Consumption Smoothing by Commodity-Dependent Exporters |
0 |
0 |
0 |
0 |
1 |
2 |
3 |
12 |
| Comparing Investment on New Transport Infrastructure: Roads vs. Railways? |
0 |
1 |
1 |
555 |
5 |
10 |
10 |
1,138 |
| Competition in the British Electricity Spot Market |
0 |
0 |
4 |
662 |
3 |
8 |
22 |
1,693 |
| Competition, Contracts and Entry in the Electricity Spot Market |
0 |
0 |
0 |
0 |
2 |
9 |
9 |
1,495 |
| Congestion Management in European Power Networks: Criteria to Assess the Available Options |
0 |
0 |
2 |
168 |
2 |
3 |
15 |
353 |
| Contracting for wind generation |
0 |
0 |
0 |
128 |
2 |
3 |
3 |
210 |
| Contracting for wind generation |
0 |
0 |
0 |
6 |
2 |
2 |
2 |
33 |
| Core Indicators for Determinants and Performance of Electricity Sector in Developing Countries |
0 |
1 |
2 |
538 |
2 |
5 |
7 |
1,269 |
| Core indicators for determinants and performance of the electricity sector in developing countries |
0 |
2 |
3 |
234 |
5 |
9 |
13 |
491 |
| Designing Efficient Renewable Electricity Support Schemes |
0 |
0 |
3 |
16 |
0 |
4 |
10 |
26 |
| Designing an electricity wholesale market to accommodate significant renewables penetration: Lessons from Britain |
0 |
0 |
0 |
19 |
0 |
1 |
2 |
58 |
| Designing an electricity wholesale market to accommodate significant renewables penetration: Lessons from Britain |
0 |
0 |
0 |
15 |
2 |
2 |
3 |
16 |
| Designing an incentive-compatible efficient Renewable Electricity Support Scheme |
0 |
0 |
6 |
53 |
2 |
7 |
18 |
106 |
| Economic Reform in Europe: Integrating and Liberalizing the Market for Services |
0 |
0 |
0 |
182 |
1 |
1 |
3 |
438 |
| Electricity Liberalisation in Britain: the quest for a satisfactory wholesale market design |
0 |
0 |
1 |
706 |
4 |
5 |
7 |
1,630 |
| Electricity Merger Policy in the Shadow of Regulation |
0 |
0 |
1 |
5 |
1 |
3 |
5 |
18 |
| Electricity Sector Reform in Developing Countries: A Survey of Empirical Evidence on Determinants and Performance |
0 |
2 |
2 |
781 |
6 |
18 |
35 |
1,579 |
| Electricity liberalisation in Britain: the quest for a satisfactory wholesale market design |
0 |
0 |
0 |
5 |
2 |
3 |
4 |
51 |
| Electricity sector reform in developing countries: a survey of empirical evidence on determinants and performance |
0 |
1 |
1 |
591 |
4 |
11 |
18 |
1,322 |
| Electricity transmission: an overview of the current debate |
0 |
0 |
1 |
2 |
1 |
2 |
4 |
34 |
| Electricity transmission: an overview of the current debate |
0 |
0 |
1 |
756 |
0 |
2 |
5 |
1,637 |
| Energy Policy Issues after Privatisation |
0 |
0 |
0 |
195 |
0 |
0 |
1 |
620 |
| Entry, Acquisition, And the Value of Shark Repellent |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
23 |
| Entry, Acquisition, and the Value of Shark Repellent |
0 |
0 |
0 |
0 |
1 |
1 |
1 |
371 |
| Estimating Urban Road Congestion Charges |
0 |
0 |
0 |
284 |
0 |
0 |
1 |
901 |
| Estimating Urban Road Congestion Costs |
0 |
0 |
0 |
430 |
2 |
3 |
4 |
888 |
| Evaluating the case for supporting renewable electricity |
0 |
0 |
0 |
62 |
0 |
4 |
4 |
93 |
| Financing low-carbon generation in the UK: The hybrid RAB model |
1 |
1 |
5 |
108 |
14 |
18 |
30 |
541 |
| Financing low-carbon generation in the UK: The hybrid RAB model |
1 |
1 |
3 |
19 |
5 |
6 |
15 |
66 |
| Fuel mix diversification incentives in liberalised electricity markets: a Mean-Variance Portfolio Theory Approach |
0 |
0 |
1 |
9 |
1 |
3 |
10 |
47 |
| GROWTH, EXTERNALITIES AND TAXATION |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
402 |
| Generation Adequacy and Investment Incentives in Britain: from the Pool to NETA |
0 |
0 |
0 |
241 |
1 |
3 |
6 |
670 |
| Generation Adequacy and Investment Incentives in Britain: from the Pool to NETA |
0 |
0 |
0 |
3 |
1 |
2 |
2 |
55 |
| Ghana's cocoa pricing policy |
0 |
1 |
2 |
302 |
4 |
7 |
13 |
1,873 |
| Horizontal Inequity and Vertical Redistribution with Indirect Taxes: the Greek Case |
0 |
0 |
0 |
113 |
2 |
2 |
3 |
448 |
| How to judge whether supporting solar PV is justified |
0 |
0 |
1 |
37 |
0 |
2 |
4 |
57 |
| How to judge whether supporting solar PV is justified |
0 |
0 |
0 |
3 |
0 |
1 |
1 |
35 |
| Implications of the National Energy and Climate Plans for the Single Electricity Market of the island of Ireland |
0 |
0 |
0 |
1 |
1 |
3 |
8 |
15 |
| Implications of the National Energy and Climate Plans for the Single Electricity Market of the island of Ireland |
0 |
0 |
0 |
18 |
3 |
5 |
6 |
41 |
| Indirect Taxation in Greece: Evaluation and Possible Reform |
0 |
0 |
0 |
220 |
2 |
4 |
4 |
886 |
| Integrating Energy Markets: Does Sequencing Matter? |
0 |
0 |
0 |
209 |
2 |
3 |
4 |
512 |
| Intertemporal Consistency Issues in Depletable Resources |
0 |
0 |
0 |
132 |
3 |
3 |
5 |
476 |
| Investment, Reprocurement and Franchise Contract Length in the British Railway Industry |
0 |
0 |
0 |
230 |
1 |
3 |
4 |
1,125 |
| Investment, Savings and Employment in the Long-Run |
0 |
0 |
0 |
62 |
0 |
0 |
4 |
342 |
| Issues and Options for Restructuring Electricity Supply Industries |
0 |
0 |
1 |
729 |
3 |
7 |
12 |
1,634 |
| Issues and options for restructuring electricity supply industries |
0 |
0 |
0 |
5 |
2 |
4 |
7 |
35 |
| Long-term Framework for Electricity Distribution Access Charges |
0 |
0 |
0 |
252 |
4 |
9 |
12 |
680 |
| Market Concentration and Competition in Eastern Europe |
0 |
0 |
0 |
320 |
1 |
3 |
4 |
1,257 |
| Market Design |
0 |
0 |
0 |
4 |
1 |
1 |
1 |
20 |
| Market design |
0 |
0 |
0 |
363 |
1 |
1 |
1 |
679 |
| Market design for a high-renewables European electricity system |
0 |
0 |
2 |
119 |
3 |
4 |
12 |
140 |
| Market design for a high-renewables European electricity system |
0 |
0 |
1 |
51 |
1 |
4 |
10 |
59 |
| Measuring inefficiency in international electricity trading |
0 |
0 |
0 |
10 |
0 |
0 |
6 |
22 |
| Measuring inefficiency in international electricity trading |
0 |
0 |
0 |
46 |
1 |
3 |
4 |
65 |
| Mediating Market Power in Electricity Networks |
0 |
0 |
0 |
4 |
1 |
1 |
3 |
52 |
| Mediating Market Power in Electricity Networks |
0 |
0 |
0 |
5 |
2 |
2 |
4 |
44 |
| Mediating Market Power in Electricity Networks |
0 |
0 |
0 |
5 |
1 |
1 |
3 |
53 |
| Mediating Market Power in Electricity Networks |
0 |
0 |
0 |
0 |
2 |
2 |
4 |
6 |
| Mediating Market Power in Electricity Networks |
0 |
0 |
0 |
0 |
2 |
3 |
3 |
3 |
| Missing Money and Missing Markets: Reliability, Capacity Auctions and Interconnectors |
1 |
1 |
1 |
12 |
4 |
6 |
9 |
66 |
| Missing Money and Missing Markets: Reliability, Capacity Auctions and Interconnectors |
0 |
0 |
2 |
115 |
3 |
7 |
12 |
317 |
| Nuclear Power: A Hedge against Uncertain Gas and Carbon Prices? |
0 |
0 |
0 |
6 |
0 |
0 |
2 |
34 |
| Nuclear Power: a Hedge against Uncertain Gas and Carbon Prices? |
0 |
0 |
4 |
323 |
2 |
5 |
12 |
895 |
| Oil Shortages, Climate Change and Collective Action |
0 |
0 |
0 |
114 |
2 |
4 |
6 |
201 |
| Oil Shortages, Climate Change and Collective Action |
0 |
0 |
0 |
4 |
0 |
0 |
0 |
15 |
| Policies for decarbonizing a liberalized power sector |
0 |
0 |
0 |
37 |
1 |
4 |
5 |
68 |
| Policies for decarbonizing a liberalized power sector |
0 |
0 |
1 |
1 |
1 |
4 |
6 |
16 |
| Policies for decarbonizing a liberalized power sector |
0 |
0 |
0 |
34 |
2 |
4 |
4 |
41 |
| Policies for decarbonizing a liberalized power sector |
0 |
0 |
0 |
26 |
2 |
4 |
5 |
41 |
| Pool Reform and Competition in Electricity, forthcoming in M. Beesley (ed.), Lectures on Regulation Series VII, London, Institute of Economic Affairs |
0 |
0 |
0 |
0 |
1 |
2 |
4 |
1,519 |
| Power Reform, Private Investment and Regional Co-operation |
0 |
0 |
0 |
2 |
0 |
0 |
0 |
12 |
| Power sector reform, private investment and regional co-operation |
0 |
0 |
0 |
281 |
3 |
4 |
4 |
711 |
| Predicting Market Power in Wholesale Electricity Markets |
0 |
0 |
1 |
156 |
4 |
8 |
21 |
239 |
| Predicting Market Power in Wholesale Electricity Markets |
1 |
1 |
1 |
196 |
4 |
5 |
7 |
330 |
| Predicting market power in wholesale electricity markets |
1 |
1 |
1 |
263 |
2 |
6 |
7 |
437 |
| Predicting market power in wholesale electricity markets |
1 |
1 |
2 |
8 |
2 |
4 |
9 |
37 |
| Pricing Carbon For Electricity Generation: National And International Dimensions |
0 |
0 |
0 |
216 |
0 |
2 |
4 |
483 |
| Pricing Carbon for Electricity Generation: National and International Dimensions |
0 |
0 |
0 |
3 |
2 |
5 |
7 |
24 |
| Pricing Electricity and Supporting Renewables in Heavily Energy Subsidized Economies |
0 |
0 |
0 |
1 |
1 |
2 |
4 |
22 |
| Pricing electricity and supporting renewables in Heavily Energy Subsidized Economies |
0 |
0 |
0 |
67 |
0 |
1 |
1 |
75 |
| Privatisation and Liberalisation of Network Utilities |
0 |
0 |
0 |
0 |
2 |
3 |
6 |
2,981 |
| Privatising Network Industries |
0 |
0 |
0 |
363 |
2 |
4 |
4 |
594 |
| Questioning the EU Target Electricity Model – how should it be adapted to deliver the Trilemma? |
0 |
0 |
1 |
51 |
3 |
7 |
9 |
79 |
| Questioning the EU Target Electricity Model – how should it be adapted to deliver the Trilemma? |
0 |
0 |
1 |
2 |
1 |
2 |
4 |
16 |
| RATIONAL EXPECTATIONS WITH MARKET POWER- THE PARADOX OF THE DISADVANTAGEOUS TARIFF ON OIL |
0 |
0 |
0 |
3 |
2 |
2 |
2 |
16 |
| ROAD TRANSPORT TAXATION IN DEVELOPING COUNTRIES |
0 |
0 |
0 |
1 |
1 |
3 |
4 |
1,428 |
| Rational Expectations With Market Power: The Paradox of the Disadvantageous Tariff |
0 |
0 |
0 |
0 |
1 |
4 |
4 |
230 |
| Rational Expectations with Market Power - The Paradox of the Disadvantageous Tariff on Oil |
0 |
0 |
0 |
6 |
3 |
4 |
6 |
176 |
| Reforming Competitive Electricity Markets to Meet Environmental Targets |
0 |
0 |
0 |
207 |
3 |
4 |
6 |
339 |
| Reforming Competitive Electricity Markets to Meet Environmental Targets |
0 |
0 |
0 |
3 |
0 |
1 |
3 |
28 |
| Reforming UK Energy Policy to Live Within Its Means |
0 |
0 |
0 |
0 |
1 |
4 |
4 |
17 |
| Reforming UK energy policy to live within its means |
0 |
0 |
0 |
70 |
2 |
2 |
3 |
81 |
| Regulation Games |
0 |
0 |
0 |
237 |
2 |
6 |
8 |
1,038 |
| Regulation Games |
0 |
0 |
0 |
21 |
1 |
1 |
2 |
67 |
| Regulation Games |
0 |
0 |
0 |
0 |
1 |
1 |
1 |
198 |
| Regulatory Challenges to European Electricity Liberalisation |
0 |
0 |
1 |
763 |
1 |
4 |
9 |
1,559 |
| Regulatory Challenges to European Electricity Liberalisation |
0 |
1 |
1 |
2 |
0 |
2 |
8 |
23 |
| Regulatory Policies and Reform in the Electricity Supply Industry |
0 |
0 |
0 |
0 |
1 |
2 |
2 |
659 |
| Road User Charges in Britain |
0 |
0 |
0 |
263 |
1 |
4 |
8 |
929 |
| Sequencing the Transition |
0 |
0 |
0 |
148 |
1 |
2 |
4 |
468 |
| Should Merchant Transmission Investment be Subject to a Must-offer Provision? |
0 |
0 |
0 |
135 |
1 |
4 |
6 |
430 |
| Should Merchant Transmission Investment be subject to a Mustoffer Provision? |
0 |
0 |
0 |
1 |
0 |
1 |
1 |
23 |
| Smoothing Primary Exporters' Price Risks: Bonds, Futures, Options and Insurance |
0 |
0 |
0 |
0 |
2 |
4 |
5 |
390 |
| Strengths and Weaknesses of the British Market Model |
0 |
0 |
0 |
62 |
3 |
3 |
4 |
132 |
| Strengths and Weaknesses of the British Market Model |
0 |
0 |
0 |
21 |
0 |
1 |
1 |
34 |
| Supply Function Equilibria: Step Functions and Continuous Representations |
0 |
0 |
2 |
120 |
3 |
10 |
13 |
1,171 |
| Supply Function Equilibria: Step Functions and Continuous Representations |
0 |
0 |
0 |
55 |
0 |
2 |
2 |
297 |
| Supply Function Equilibria: Step functions and continuous representations |
0 |
0 |
0 |
2 |
0 |
2 |
5 |
26 |
| Tax Reform, Trade Liberalisation and Industrial Restructuring in Hungary |
0 |
0 |
0 |
140 |
1 |
2 |
4 |
690 |
| Tax and Benefit Reform in Central and Eastern Europe |
0 |
0 |
1 |
338 |
1 |
1 |
4 |
837 |
| The Burden and Disincentive Effects of Hungarian Personal Taxes 1988-96 |
0 |
0 |
0 |
43 |
1 |
2 |
2 |
310 |
| The Choice of Techniques in a Dual Economy |
0 |
0 |
0 |
34 |
1 |
1 |
1 |
333 |
| The Cost of Carbon Leakage: Britain’s Carbon Price Support and Cross-border Electricity Trade |
0 |
0 |
0 |
24 |
1 |
1 |
2 |
71 |
| The Cost of Trade Distortion: Britain's Carbon Price Support and Cross-border Electricity Trade |
0 |
0 |
0 |
29 |
1 |
2 |
5 |
31 |
| The Effect of Protection on Manufactured Exports from Developing Countries |
0 |
0 |
0 |
70 |
2 |
3 |
4 |
505 |
| The Environmental Benefits from Road Pricing |
0 |
0 |
0 |
420 |
1 |
2 |
5 |
1,196 |
| The Final Hurdle?: Security of supply, the Capacity Mechanism and the role of interconnectors |
0 |
0 |
0 |
2 |
1 |
1 |
4 |
27 |
| The Final Hurdle?: Security of supply, the Capacity Mechanism and the role of interconnectors |
0 |
0 |
0 |
45 |
2 |
3 |
5 |
64 |
| The Fundamental Theorem of Road User Charges |
0 |
0 |
2 |
194 |
0 |
3 |
6 |
619 |
| The Impact of Unilateral Carbon Taxes on Cross-Border Electricity Trading |
0 |
0 |
0 |
31 |
5 |
5 |
13 |
73 |
| The Impact of a Carbon Tax on Cross-Border Electricity Trading (replaced with WP2005) |
0 |
0 |
0 |
9 |
3 |
5 |
6 |
26 |
| The Political Economy of Carbon Pricing: a Panel Analysis |
0 |
0 |
2 |
14 |
2 |
7 |
13 |
65 |
| The Privatisation of British Gas and the Possible Consequences for the European Gas Market |
0 |
0 |
0 |
427 |
1 |
3 |
5 |
3,200 |
| The Relationship Between Regulation and Competition Policy for Network Utilities |
0 |
0 |
0 |
5 |
1 |
4 |
6 |
30 |
| The Restructuring and Privatisation of the CEGB: Was It Worth It? |
0 |
0 |
0 |
0 |
4 |
6 |
12 |
4,258 |
| The Restructuring and Privatization of the U.K. Electricity Supply-Was It Worth It? |
0 |
0 |
3 |
44 |
3 |
3 |
19 |
106 |
| The Robustness of Agent-Based Models of Electricity Wholesale Markets |
0 |
0 |
0 |
2 |
0 |
0 |
1 |
9 |
| The Role of Public Enterprises in the National Economy |
0 |
0 |
0 |
0 |
0 |
0 |
6 |
10,800 |
| The Strategic Robustness of Mark-up Equilibria |
0 |
0 |
0 |
12 |
0 |
1 |
3 |
92 |
| The Supply Function Equilibrium and Its Policy Implications for Wholesale Electricity Auctions |
1 |
1 |
1 |
75 |
2 |
3 |
3 |
172 |
| The Supply Function Equilibrium and its Policy Implications for Wholesale Electricity Auctions |
1 |
1 |
1 |
170 |
3 |
6 |
6 |
368 |
| The benefits of integrating European electricity markets |
0 |
0 |
0 |
47 |
5 |
6 |
6 |
97 |
| The benefits of integrating European electricity markets |
0 |
0 |
0 |
6 |
1 |
5 |
9 |
35 |
| The cost of CO2 abatement from Britain's only PWR: Sizewell B |
0 |
0 |
0 |
9 |
0 |
2 |
3 |
17 |
| The cost of CO2 abatement from Britain’s only PWR: Sizewell B |
0 |
0 |
0 |
13 |
1 |
1 |
4 |
30 |
| The cost of uncoupling GB interconnectors |
0 |
0 |
0 |
1 |
2 |
6 |
7 |
13 |
| The cost of uncoupling GB interconnectors |
0 |
0 |
1 |
28 |
1 |
2 |
8 |
63 |
| The economics of air pollution from fossil fuels |
0 |
0 |
1 |
87 |
2 |
2 |
5 |
105 |
| The economics of air pollution from fossil fuels |
0 |
0 |
0 |
24 |
2 |
2 |
4 |
31 |
| The impact of a Carbon Tax on the CO2 emissions reduction of wind |
0 |
0 |
0 |
28 |
3 |
3 |
6 |
59 |
| The impact of a Carbon Tax on the CO2 emissions reduction of wind |
0 |
0 |
0 |
69 |
4 |
4 |
5 |
182 |
| The long-Run Equilibrium Impact of Intermittent Renewables on Wholesale Electricity Prices |
1 |
1 |
1 |
3 |
3 |
3 |
3 |
34 |
| The long-run equilibrium impact of intermittent renewables on wholesale electricity prices |
0 |
0 |
0 |
55 |
5 |
5 |
8 |
78 |
| The political economy of carbon pricing: a panel analysis |
0 |
0 |
1 |
110 |
1 |
4 |
6 |
169 |
| The private and social value of British electrical interconnectors |
0 |
0 |
0 |
12 |
1 |
2 |
3 |
25 |
| The private and social value of British electrical interconnectors |
0 |
0 |
0 |
16 |
1 |
3 |
3 |
54 |
| The relationship between regulation and competition policy for network utilities |
0 |
0 |
0 |
577 |
2 |
7 |
8 |
1,150 |
| The robustness of industrial commodity oligopoly pricing strategies |
0 |
0 |
0 |
42 |
1 |
2 |
3 |
73 |
| The robustness of industrial commodity oligopoly pricing strategies |
0 |
1 |
1 |
5 |
0 |
4 |
4 |
21 |
| The supply function equilibrium and its policy implications for wholesale electricity auctions |
0 |
0 |
0 |
0 |
1 |
1 |
2 |
23 |
| Time-Consistent Oil Import Tariffs |
0 |
0 |
0 |
67 |
2 |
2 |
2 |
457 |
| Transport policy for a post-Covid UK |
0 |
0 |
0 |
28 |
4 |
5 |
6 |
54 |
| Transport policy for a post-Covid UK |
0 |
0 |
0 |
15 |
3 |
4 |
4 |
37 |
| Transport policy for a post-Covid UK |
0 |
0 |
0 |
3 |
2 |
4 |
5 |
11 |
| UK Electricity Market Reform and the Energy Transition: Emerging Lessons |
0 |
1 |
2 |
76 |
4 |
8 |
13 |
150 |
| UK Electricity Market Reform and the Energy Transition: Emerging Lessons |
0 |
0 |
1 |
29 |
2 |
3 |
10 |
47 |
| Under-pricing electricity and the puzzle of regulatory accounting |
0 |
0 |
0 |
122 |
1 |
3 |
4 |
254 |
| Under-pricing electricity and the puzzle of regulatory accounting |
0 |
0 |
0 |
0 |
0 |
1 |
2 |
7 |
| Urban Congestion Charging: Theory, Practice and Environmental Consequences |
0 |
2 |
2 |
434 |
1 |
5 |
8 |
1,907 |
| Using Probabilistic Analysis to Value Power Generation Investments Under Uncertainty |
0 |
0 |
0 |
508 |
1 |
5 |
7 |
1,006 |
| Using Probabilistic Analysis to Value Power Generation Investments Under Uncertainty |
0 |
0 |
1 |
5 |
5 |
7 |
9 |
38 |
| Wage Rigidity, Implicit Contracts, Unemployment and Economic Efficiency |
0 |
0 |
0 |
210 |
4 |
4 |
8 |
949 |
| What future(s) for liberalized electricity markets: efficient, equitable or innovative? |
0 |
0 |
0 |
1 |
2 |
7 |
8 |
19 |
| What future(s) for liberalized electricity markets: efficient, equitable or innovative? |
0 |
0 |
0 |
86 |
3 |
6 |
8 |
178 |
| What is the target battery cost at which Battery Electric Vehicles are socially cost competitive? |
0 |
0 |
0 |
3 |
0 |
2 |
2 |
12 |
| What is the target battery cost at which Battery Electric Vehicles are socially cost competitive? |
0 |
0 |
1 |
30 |
1 |
2 |
4 |
81 |
| When is a carbon price floor desirable? |
0 |
0 |
1 |
24 |
2 |
7 |
8 |
54 |
| When is a carbon price floor desirable? |
0 |
0 |
1 |
71 |
2 |
6 |
9 |
173 |
| Where the Champsaur Commission Has Got It Wrong |
0 |
0 |
0 |
0 |
1 |
2 |
3 |
31 |
| Why Tax Energy? Towards a More Rational Energy Policy |
0 |
0 |
1 |
861 |
4 |
7 |
10 |
1,600 |
| Wind, water and wires: evaluating joint wind and interconnector capacity expansions in hydro-rich regions |
0 |
0 |
0 |
12 |
1 |
1 |
6 |
27 |
| Total Working Papers |
10 |
24 |
101 |
24,144 |
355 |
705 |
1,222 |
94,063 |
| Journal Article |
File Downloads |
Abstract Views |
| Last month |
3 months |
12 months |
Total |
Last month |
3 months |
12 months |
Total |
| A NUCLEAR FUTURE? UK GOVERNMENT POLICY AND THE ROLE OF THE MARKET |
0 |
0 |
0 |
20 |
0 |
1 |
2 |
80 |
| A theorem on the measurement of inequality |
1 |
3 |
3 |
200 |
2 |
4 |
4 |
376 |
| A unit commitment and economic dispatch model of the GB electricity market – Formulation and application to hydro pumped storage |
0 |
0 |
0 |
2 |
3 |
5 |
8 |
25 |
| Agricultural pricing and public investment |
0 |
0 |
0 |
25 |
0 |
2 |
3 |
87 |
| Allocating Transmission to Mitigate Market Power in Electricity Markets |
0 |
0 |
0 |
0 |
2 |
3 |
5 |
316 |
| Alternative Entry Paths: The Build Or Buy Decision |
0 |
0 |
0 |
4 |
0 |
2 |
6 |
24 |
| Alternative Entry Paths: The Build or Buy Decision |
0 |
0 |
0 |
0 |
0 |
1 |
5 |
500 |
| Analytical Screens for Electricity Mergers |
0 |
0 |
0 |
66 |
1 |
2 |
4 |
198 |
| Cartels, storage, and the suppression of futures markets |
0 |
0 |
0 |
39 |
0 |
0 |
0 |
120 |
| Charging for Roads |
0 |
0 |
0 |
0 |
0 |
0 |
3 |
267 |
| Che cosa pu? imparare l'Europa dalle privatizzazioni britanniche |
0 |
0 |
0 |
3 |
0 |
1 |
2 |
43 |
| Climate Change Policy and Its Effect on Market Power in the Gas Market |
0 |
0 |
0 |
78 |
2 |
4 |
6 |
276 |
| Commodity Price Stabilization in Imperfect or Cartelized Markets |
0 |
0 |
0 |
112 |
0 |
2 |
4 |
509 |
| Comparing Investments in New Transport Infrastructure: Roads versus Railways? |
0 |
0 |
0 |
0 |
1 |
4 |
4 |
391 |
| Competition in the British Electricity Spot Market |
4 |
8 |
25 |
1,493 |
10 |
24 |
67 |
3,868 |
| Competition in the Electricity Industry in England and Wales |
0 |
0 |
0 |
1 |
2 |
3 |
5 |
670 |
| Competition, Contracts, and Entry in the Electricity Spot Market |
0 |
2 |
2 |
456 |
2 |
8 |
10 |
1,187 |
| Contracting for Wind Generation |
0 |
1 |
1 |
20 |
2 |
3 |
3 |
85 |
| Cropsharing Tenancy in Agriculture: Comment |
0 |
0 |
0 |
26 |
2 |
4 |
6 |
216 |
| Determining the regulatory asset base for utility price regulation |
0 |
0 |
1 |
1,035 |
0 |
0 |
2 |
2,908 |
| Disadvantageous Oil Tariffs and Dynamic Consistency |
0 |
0 |
0 |
22 |
3 |
5 |
6 |
685 |
| Dynamically Consistent Oil Import Tariffs |
0 |
0 |
0 |
30 |
2 |
3 |
5 |
333 |
| Economic reform in Europe: integrating and liberalizing the market for services |
0 |
0 |
0 |
65 |
3 |
3 |
5 |
181 |
| Electricity liberalization in Britain: The quest for a satisfactory wholesale market design |
0 |
1 |
2 |
74 |
4 |
6 |
12 |
312 |
| Electricity transmission arrangements in Great Britain: Time for change? |
0 |
0 |
2 |
29 |
2 |
4 |
6 |
109 |
| Electricity transmission: An overview of the current debate |
0 |
0 |
2 |
237 |
0 |
7 |
13 |
564 |
| Evaluating the case for supporting renewable electricity |
1 |
1 |
4 |
18 |
2 |
4 |
9 |
94 |
| Evolution of electricity markets: Does sequencing matter? |
0 |
0 |
0 |
72 |
1 |
2 |
2 |
333 |
| Experimental approach to the determination of the demand for public goods: A comment |
0 |
0 |
0 |
13 |
0 |
1 |
1 |
51 |
| Financial Instruments for Consumption Smoothing by Commodity-Dependent Exporters |
0 |
0 |
0 |
1 |
0 |
0 |
0 |
12 |
| Fuel mix diversification incentives in liberalized electricity markets: A Mean-Variance Portfolio theory approach |
0 |
0 |
3 |
295 |
2 |
6 |
16 |
681 |
| Growth, Externalities and Taxation |
0 |
0 |
0 |
0 |
3 |
3 |
4 |
131 |
| High renewable electricity penetration: Marginal curtailment and market failure under “subsidy-free” entry |
0 |
0 |
2 |
2 |
3 |
5 |
10 |
14 |
| Horizontal Inequity and Vertical Redistribution with Indirect Taxes: The Greek Case* |
0 |
0 |
0 |
24 |
0 |
1 |
1 |
98 |
| Hydropower Economics by Førsund, Finn R |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
5 |
| Indirect Taxation in Greece: Evaluation and Possible Reform |
0 |
0 |
0 |
83 |
1 |
3 |
4 |
338 |
| Integrating electricity transmission systems |
0 |
0 |
0 |
68 |
0 |
0 |
0 |
156 |
| Introduction |
0 |
0 |
0 |
2 |
1 |
2 |
4 |
55 |
| Investment Incentives and Electricity Market Design: the British Experience |
0 |
0 |
1 |
283 |
3 |
5 |
12 |
583 |
| Investment, Savings and Employment in the Long-Run |
0 |
0 |
0 |
31 |
0 |
1 |
4 |
160 |
| Market Concentration and Competition in Eastern Europe |
0 |
0 |
1 |
11 |
0 |
1 |
4 |
37 |
| Market design for a high-renewables European electricity system |
1 |
2 |
9 |
100 |
9 |
19 |
46 |
342 |
| Market design for a large share of wind power |
0 |
0 |
0 |
168 |
2 |
4 |
4 |
346 |
| Measuring inefficiency in international electricity trading |
0 |
0 |
2 |
4 |
0 |
2 |
7 |
23 |
| Missing money and missing markets: Reliability, capacity auctions and interconnectors |
0 |
0 |
8 |
49 |
3 |
12 |
33 |
174 |
| Multi-level planning: Case studies in Mexico: L.M. Goreux and A.S. Manne, eds., (North-Holland Publishing Company, Amsterdam, 1973) 556 pp |
0 |
0 |
2 |
61 |
1 |
1 |
3 |
155 |
| National Energy and Climate Plans for the island of Ireland: wind curtailment, interconnectors and storage |
0 |
0 |
1 |
6 |
1 |
3 |
7 |
18 |
| Network capacity auctions: promise and problems |
0 |
0 |
1 |
75 |
7 |
9 |
11 |
190 |
| New Approaches in Agricultural Policy Research: Discussion |
0 |
0 |
0 |
0 |
0 |
2 |
3 |
11 |
| Nuclear Power: A Hedge against Uncertain Gas and Carbon Prices? |
0 |
0 |
1 |
46 |
5 |
9 |
18 |
289 |
| OPEC and the U.S. Oil Import Tariff |
0 |
0 |
0 |
217 |
1 |
4 |
4 |
1,899 |
| Oil Prices, Cartels, and the Problem of Dynamic Inconsistency |
0 |
0 |
0 |
245 |
0 |
4 |
9 |
729 |
| On the accuracy of the mean-variance approximation for futures markets |
0 |
0 |
0 |
44 |
0 |
0 |
1 |
140 |
| On the desirability of input taxes |
0 |
0 |
3 |
65 |
3 |
6 |
11 |
196 |
| Optimal Commodity Stock-piling Rules |
0 |
0 |
0 |
86 |
1 |
3 |
5 |
488 |
| Optimal Trade Taxes on Agriculture in Developing Countries |
0 |
0 |
0 |
101 |
0 |
0 |
0 |
449 |
| Optimal tariffs on exhaustible resources |
0 |
0 |
0 |
145 |
0 |
0 |
0 |
259 |
| Optimal tax rates and tax design during systemic reform |
0 |
0 |
0 |
199 |
1 |
2 |
4 |
406 |
| Pareto Inferior Trade |
0 |
0 |
2 |
401 |
31 |
37 |
59 |
1,408 |
| Policies for decarbonizing a liberalized power sector |
0 |
0 |
0 |
1 |
3 |
5 |
8 |
39 |
| Power Markets and Market Power |
0 |
0 |
1 |
139 |
2 |
3 |
5 |
885 |
| Preemptive Patenting and the Persistence of Monopoly |
7 |
13 |
40 |
1,719 |
20 |
43 |
114 |
4,244 |
| Preemptive Patenting and the Persistence of Monopoly: Reply |
0 |
0 |
0 |
95 |
3 |
3 |
8 |
359 |
| Pricing Electricity and Supporting Renewables in Heavily Energy Subsidized Economies |
0 |
0 |
0 |
8 |
1 |
1 |
2 |
71 |
| Pricing and Congestion: Economic Principles Relevant to Pricing Roads |
0 |
0 |
0 |
1 |
0 |
4 |
8 |
1,551 |
| Privatisation and liberalisation of network utilities |
1 |
2 |
5 |
268 |
5 |
9 |
16 |
513 |
| Problems of liberalising the electricity industry |
0 |
1 |
8 |
282 |
4 |
9 |
21 |
629 |
| Public Policy in the Dual Economy |
0 |
0 |
0 |
21 |
1 |
3 |
4 |
115 |
| Redistributive impact of indirect tax reforms: Greece, 1988-2002 |
0 |
0 |
0 |
0 |
0 |
3 |
7 |
270 |
| Reform in Hungary: Sequencing and privatisation |
0 |
0 |
0 |
76 |
2 |
5 |
7 |
175 |
| Reforming Competitive Electricity Markets to Meet Environmental Targets |
0 |
0 |
1 |
32 |
3 |
5 |
7 |
136 |
| Regulating Unbundled Network Utilities |
0 |
0 |
1 |
80 |
2 |
5 |
10 |
198 |
| Regulation and competition policy: longer-term boundaries |
0 |
0 |
0 |
54 |
1 |
1 |
1 |
129 |
| Removing coal subsidies: Implications for European electricity markets |
0 |
0 |
0 |
14 |
1 |
2 |
3 |
61 |
| Restructuring and privatizing electric utilities in Eastern Europe |
0 |
0 |
0 |
23 |
3 |
7 |
8 |
78 |
| Risk Aversion, Supply Response, and the Optimality of Random Prices: A Diagrammatic Analysis |
0 |
0 |
0 |
59 |
1 |
4 |
6 |
207 |
| Risk Sharing, Sharecropping and Uncertain Labour Markets |
0 |
1 |
1 |
139 |
1 |
2 |
6 |
330 |
| Road Damage Externalities and Road User Charges |
0 |
0 |
1 |
425 |
0 |
4 |
9 |
2,200 |
| Road User Charges in Britain |
0 |
0 |
0 |
153 |
1 |
1 |
4 |
468 |
| Road taxes, road user charges and earmarking |
0 |
0 |
1 |
201 |
2 |
5 |
19 |
710 |
| Royal Commission Report on Transport and the Environment--Economic Effects of Recommendations |
0 |
0 |
0 |
81 |
1 |
1 |
2 |
382 |
| Security of Supply, the Role of Interconnectors and Option Values: insights from the GB Capacity Auction |
0 |
0 |
3 |
55 |
1 |
5 |
11 |
166 |
| Setting the Price of Oil in a Distorted Economy |
0 |
0 |
1 |
47 |
2 |
2 |
4 |
241 |
| Shifting demand and supply over time and space to manage intermittent generation: The economics of electrical storage |
0 |
0 |
2 |
41 |
2 |
7 |
12 |
157 |
| Should Carbon Taxes Be Additional to Other Transport Fuel Taxes? |
0 |
0 |
0 |
25 |
3 |
4 |
5 |
209 |
| Should merchant transmission investment be subject to a must-offer provision? |
0 |
0 |
0 |
52 |
1 |
6 |
6 |
161 |
| Smoothing Primary Exporters' Price Risks: Bonds, Futures, Options and Insurance |
0 |
0 |
0 |
63 |
1 |
2 |
3 |
308 |
| Stochastic Limit Pricing |
0 |
0 |
0 |
32 |
1 |
4 |
4 |
236 |
| Supply function equilibria: Step functions and continuous representations |
0 |
0 |
1 |
45 |
4 |
5 |
8 |
310 |
| Tales of two islands – Lessons for EU energy policy from electricity market reforms in Britain and Ireland |
0 |
1 |
5 |
43 |
2 |
6 |
20 |
124 |
| Tax and expenditure policies in Hungary* |
0 |
0 |
0 |
10 |
1 |
1 |
3 |
48 |
| The Choice of Techniques and the Optimality of Market Equilibrium with Rational Expectations |
0 |
0 |
0 |
107 |
3 |
9 |
13 |
508 |
| The Distributional Impact of Price Changes in Hungary and the United Kingdom |
0 |
0 |
0 |
105 |
0 |
0 |
0 |
374 |
| The Dynamic Efficiency of Regulatory Constitutions |
0 |
0 |
0 |
201 |
1 |
4 |
7 |
540 |
| The Evolution of the Tax Structure of a Reforming Transitional Economy: Hungary 1988–98 |
0 |
2 |
2 |
48 |
0 |
2 |
3 |
174 |
| The Impact of EC Environmental Policy on British Coal |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
242 |
| The Impact of Structural and Contractual Arrangements on a Vertically Separated Railway |
0 |
1 |
1 |
50 |
8 |
11 |
14 |
197 |
| The Impact of Sulfur Limits on Fuel Demand and Electricity Prices in Britain |
0 |
0 |
0 |
4 |
0 |
0 |
0 |
50 |
| The Impact of a Carbon Tax on the CO2 Emissions Reduction of Wind |
0 |
0 |
1 |
16 |
2 |
4 |
7 |
106 |
| The Isolation Paradox and the Discount Rate for Benefit-Cost Analysis: A Comment |
0 |
0 |
0 |
113 |
0 |
0 |
2 |
482 |
| The Open-Loop von Stackelberg Equilibrium in the Cartel versus Fringe Model: A Reply |
0 |
0 |
0 |
90 |
0 |
1 |
3 |
539 |
| The Political Economy of a Carbon Price Floor for Power Generation |
0 |
0 |
0 |
82 |
3 |
4 |
14 |
303 |
| The Restructuring and Privatisation of Britain's CEGB—Was It Worth It? |
1 |
3 |
6 |
576 |
2 |
7 |
16 |
1,744 |
| The Robustness of Equilibrium Analysis in the Dual Economy |
0 |
0 |
0 |
9 |
1 |
1 |
10 |
100 |
| The Role of Public Enterprises in the National Economy |
0 |
0 |
0 |
2 |
1 |
1 |
5 |
15 |
| The Theory of Commodity Price Stabilisation Rules: Welfare Impacts and Supply Responses |
0 |
1 |
1 |
314 |
1 |
3 |
6 |
730 |
| The Theory of Food Price Stabilisation |
1 |
1 |
4 |
272 |
1 |
2 |
17 |
1,501 |
| The benefits of integrating European electricity markets |
1 |
1 |
2 |
38 |
6 |
12 |
26 |
178 |
| The cost of uncoupling |
0 |
0 |
0 |
3 |
0 |
0 |
1 |
8 |
| The cost of uncoupling GB interconnectors |
0 |
1 |
1 |
3 |
0 |
3 |
3 |
22 |
| The importance of malleable capital in optimal growth models |
0 |
0 |
0 |
18 |
0 |
1 |
2 |
125 |
| The political economy of carbon pricing: a panel analysis |
0 |
4 |
14 |
110 |
2 |
15 |
38 |
296 |
| The private and social value of British electrical interconnectors |
0 |
0 |
2 |
5 |
2 |
4 |
9 |
19 |
| The regulation of the gas industry: lessons from electricity |
0 |
0 |
0 |
0 |
1 |
3 |
4 |
309 |
| The regulator's review of the English Electricity Pool |
0 |
0 |
0 |
63 |
1 |
4 |
9 |
242 |
| The strategic robustness of oligopoly electricity market models |
0 |
1 |
3 |
23 |
3 |
7 |
11 |
92 |
| The supply function equilibrium and its policy implications for wholesale electricity auctions |
1 |
1 |
2 |
66 |
3 |
3 |
6 |
204 |
| The theory of environmental policy: W.J. Baumol and W.E. Oates (Prentice Hall, Englewood Cliffs, NJ, 1975) pp. xii+272, [UK pound]8.25 |
0 |
0 |
1 |
1,157 |
1 |
3 |
13 |
2,955 |
| Towards a green energy economy? The EU Energy Union’s transition to a low-carbon zero subsidy electricity system – Lessons from the UK’s Electricity Market Reform |
2 |
3 |
6 |
29 |
3 |
5 |
13 |
140 |
| Transformation in mature versus emerging economies: Why has Hungary been less successful than China? |
0 |
0 |
0 |
70 |
1 |
2 |
3 |
690 |
| UK Electricity Market Reform and the Energy Transition: Emerging Lessons |
1 |
1 |
6 |
27 |
5 |
10 |
26 |
145 |
| Uncertain Innovation and the Persistence of Monopoly: Comment |
0 |
0 |
0 |
88 |
2 |
4 |
7 |
309 |
| Wage Rigidity, Implicit Contracts, Unemployment and Economic Efficiency |
0 |
0 |
0 |
103 |
1 |
4 |
9 |
405 |
| What future(s) for liberalized electricity markets: efficient, equitable or innovative? |
0 |
1 |
1 |
8 |
5 |
7 |
12 |
67 |
| What is needed for battery electric vehicles to become socially cost competitive? |
0 |
0 |
0 |
14 |
0 |
1 |
3 |
66 |
| When Do Futures Destabilize Spot Prices? |
0 |
0 |
0 |
119 |
5 |
6 |
9 |
340 |
| Where the Champsaur Commission Has Got It Wrong |
0 |
0 |
0 |
56 |
1 |
3 |
3 |
130 |
| Why Tax Energy? Towards a More Rational Policy |
0 |
0 |
1 |
18 |
3 |
3 |
5 |
130 |
| Total Journal Articles |
22 |
57 |
203 |
15,243 |
267 |
568 |
1,173 |
54,787 |