| Working Paper |
File Downloads |
Abstract Views |
| Last month |
3 months |
12 months |
Total |
Last month |
3 months |
12 months |
Total |
| A Nuclear Future? UK Government Policy and the Role of the Market |
0 |
0 |
0 |
3 |
2 |
3 |
4 |
16 |
| A Nuclear Future? UK Government Policy and the Role of the Market? |
0 |
0 |
0 |
136 |
3 |
9 |
9 |
236 |
| A Review of the Monitoring of Market Power The Possible Roles of TSOs in Monitoring for Market Power Issues in Congested Transmission Systems |
0 |
2 |
7 |
795 |
5 |
12 |
33 |
1,960 |
| A Review of the Monitoring of Market Power: The Possible Roles of TSOs in Monitoring for Market Power Issues in Congested Transmission Systems |
0 |
0 |
0 |
245 |
3 |
8 |
9 |
702 |
| A Template for Power Reform |
0 |
0 |
0 |
4 |
2 |
4 |
5 |
25 |
| A Unit Commitment and Economic Dispatch Model of the GB Electricity Market – Formulation and Application to Hydro Pumped Storage |
0 |
0 |
1 |
11 |
2 |
7 |
14 |
45 |
| A Unit Commitment and Economic Dispatch Model of the GB Electricity Market – Formulation and Application to Hydro Pumped Storage |
0 |
0 |
0 |
25 |
6 |
8 |
14 |
86 |
| A simple introduction to the economics of storage: shifting demand and supply over time and space |
0 |
0 |
0 |
16 |
3 |
5 |
10 |
47 |
| A simple introduction to the economics of storage: shifting demand and supply over time and space |
0 |
0 |
1 |
35 |
3 |
8 |
13 |
121 |
| Acid Rain |
0 |
0 |
0 |
398 |
3 |
5 |
10 |
2,834 |
| Allocating Transmission to Mitigate Market Power in Electricity Networks |
0 |
0 |
0 |
3 |
3 |
7 |
8 |
23 |
| Allocating Transmission to Mitigate Market Power in Electricity Networks |
0 |
0 |
0 |
395 |
8 |
10 |
12 |
910 |
| Alternative instruments for smoothing the consumption of primary commodity exporters |
0 |
0 |
0 |
73 |
3 |
7 |
8 |
351 |
| An Analysis of the Hungarian Tax Reform |
0 |
0 |
0 |
111 |
3 |
5 |
5 |
488 |
| An Analysis of the Importance of the Malleable Capital Assumption in Optimal Growth Models |
0 |
0 |
0 |
22 |
4 |
4 |
4 |
277 |
| Analytic Solutions for Supply Function Equilibria: Uniqueness and Stability |
0 |
0 |
0 |
93 |
3 |
7 |
10 |
326 |
| Analytic Solutions for Supply Function Equilibria: Uniqueness and Stability |
0 |
0 |
0 |
1 |
1 |
2 |
4 |
16 |
| Auctions and trading in energy markets - an economic analysis |
0 |
0 |
0 |
7 |
3 |
4 |
5 |
33 |
| Auctions and trading in energy markets -- an economic analysis |
0 |
0 |
0 |
951 |
1 |
4 |
7 |
1,926 |
| Calculating The Social Cost Of Carbon |
0 |
0 |
0 |
293 |
3 |
9 |
12 |
890 |
| Calculating the social cost of carbon |
0 |
0 |
0 |
14 |
1 |
2 |
3 |
86 |
| Capacity-Constrained Supply Function Equilibria: Competition and Entry in the Electricity Spot Market and Competition and Regulation in English Electricity Industry |
0 |
0 |
0 |
0 |
2 |
2 |
7 |
955 |
| Climate Change Policy and its Effect on Market Power in the Gas Market |
0 |
0 |
0 |
1 |
8 |
9 |
11 |
28 |
| Climate change policy and its effect on market power in the gas market |
0 |
0 |
0 |
200 |
7 |
11 |
13 |
499 |
| Club goods and a tragedy of the commons: the Clean Energy Package and wind curtailment |
0 |
0 |
2 |
39 |
3 |
9 |
14 |
120 |
| Club goods and a tragedy of the commons: the Clean Energy Package and wind curtailment |
1 |
1 |
1 |
12 |
1 |
1 |
5 |
18 |
| Commodity Bonds for Smoothing the Consumption of Primary Commodity Exporters |
0 |
0 |
0 |
3 |
0 |
0 |
4 |
41 |
| Commodity Bonds with Put Options for Consumption Smoothing by Commodity-Dependent Exporters |
0 |
0 |
0 |
0 |
3 |
5 |
6 |
15 |
| Comparing Investment on New Transport Infrastructure: Roads vs. Railways? |
0 |
1 |
1 |
555 |
5 |
13 |
15 |
1,143 |
| Competition in the British Electricity Spot Market |
0 |
0 |
4 |
662 |
3 |
10 |
25 |
1,696 |
| Competition, Contracts and Entry in the Electricity Spot Market |
0 |
0 |
0 |
0 |
5 |
11 |
14 |
1,500 |
| Congestion Management in European Power Networks: Criteria to Assess the Available Options |
0 |
0 |
2 |
168 |
4 |
6 |
19 |
357 |
| Contracting for wind generation |
0 |
0 |
0 |
6 |
2 |
4 |
4 |
35 |
| Contracting for wind generation |
0 |
0 |
0 |
128 |
2 |
4 |
5 |
212 |
| Core Indicators for Determinants and Performance of Electricity Sector in Developing Countries |
0 |
0 |
2 |
538 |
5 |
9 |
11 |
1,274 |
| Core indicators for determinants and performance of the electricity sector in developing countries |
0 |
1 |
3 |
234 |
4 |
12 |
17 |
495 |
| Designing Efficient Renewable Electricity Support Schemes |
0 |
0 |
3 |
16 |
3 |
7 |
13 |
29 |
| Designing an electricity wholesale market to accommodate significant renewables penetration: Lessons from Britain |
0 |
0 |
0 |
19 |
1 |
1 |
3 |
59 |
| Designing an electricity wholesale market to accommodate significant renewables penetration: Lessons from Britain |
0 |
0 |
0 |
15 |
1 |
3 |
4 |
17 |
| Designing an incentive-compatible efficient Renewable Electricity Support Scheme |
1 |
1 |
7 |
54 |
2 |
7 |
20 |
108 |
| Economic Reform in Europe: Integrating and Liberalizing the Market for Services |
0 |
0 |
0 |
182 |
5 |
6 |
8 |
443 |
| Electricity Liberalisation in Britain: the quest for a satisfactory wholesale market design |
0 |
0 |
1 |
706 |
4 |
9 |
11 |
1,634 |
| Electricity Merger Policy in the Shadow of Regulation |
0 |
0 |
1 |
5 |
5 |
7 |
10 |
23 |
| Electricity Sector Reform in Developing Countries: A Survey of Empirical Evidence on Determinants and Performance |
0 |
1 |
2 |
781 |
4 |
17 |
38 |
1,583 |
| Electricity liberalisation in Britain: the quest for a satisfactory wholesale market design |
0 |
0 |
0 |
5 |
5 |
8 |
9 |
56 |
| Electricity sector reform in developing countries: a survey of empirical evidence on determinants and performance |
0 |
1 |
1 |
591 |
9 |
16 |
26 |
1,331 |
| Electricity transmission: an overview of the current debate |
0 |
0 |
1 |
2 |
2 |
3 |
6 |
36 |
| Electricity transmission: an overview of the current debate |
0 |
0 |
1 |
756 |
5 |
5 |
10 |
1,642 |
| Energy Policy Issues after Privatisation |
0 |
0 |
0 |
195 |
0 |
0 |
1 |
620 |
| Entry, Acquisition, And the Value of Shark Repellent |
0 |
0 |
0 |
0 |
1 |
1 |
2 |
24 |
| Entry, Acquisition, and the Value of Shark Repellent |
0 |
0 |
0 |
0 |
1 |
2 |
2 |
372 |
| Estimating Urban Road Congestion Charges |
0 |
0 |
0 |
284 |
12 |
12 |
13 |
913 |
| Estimating Urban Road Congestion Costs |
0 |
0 |
0 |
430 |
0 |
3 |
4 |
888 |
| Evaluating the case for supporting renewable electricity |
0 |
0 |
0 |
62 |
4 |
7 |
8 |
97 |
| Financing low-carbon generation in the UK: The hybrid RAB model |
0 |
1 |
3 |
19 |
5 |
11 |
19 |
71 |
| Financing low-carbon generation in the UK: The hybrid RAB model |
0 |
1 |
4 |
108 |
14 |
31 |
43 |
555 |
| Fuel mix diversification incentives in liberalised electricity markets: a Mean-Variance Portfolio Theory Approach |
0 |
0 |
1 |
9 |
3 |
6 |
13 |
50 |
| GROWTH, EXTERNALITIES AND TAXATION |
0 |
0 |
0 |
0 |
2 |
2 |
3 |
404 |
| Generation Adequacy and Investment Incentives in Britain: from the Pool to NETA |
0 |
0 |
0 |
241 |
2 |
4 |
8 |
672 |
| Generation Adequacy and Investment Incentives in Britain: from the Pool to NETA |
0 |
0 |
0 |
3 |
4 |
5 |
6 |
59 |
| Ghana's cocoa pricing policy |
0 |
1 |
2 |
302 |
6 |
13 |
18 |
1,879 |
| Horizontal Inequity and Vertical Redistribution with Indirect Taxes: the Greek Case |
0 |
0 |
0 |
113 |
12 |
14 |
15 |
460 |
| How to judge whether supporting solar PV is justified |
0 |
0 |
0 |
3 |
1 |
2 |
2 |
36 |
| How to judge whether supporting solar PV is justified |
0 |
0 |
1 |
37 |
3 |
4 |
7 |
60 |
| Implications of the National Energy and Climate Plans for the Single Electricity Market of the island of Ireland |
0 |
0 |
0 |
1 |
6 |
9 |
14 |
21 |
| Implications of the National Energy and Climate Plans for the Single Electricity Market of the island of Ireland |
1 |
1 |
1 |
19 |
3 |
8 |
9 |
44 |
| Indirect Taxation in Greece: Evaluation and Possible Reform |
0 |
0 |
0 |
220 |
3 |
6 |
7 |
889 |
| Integrating Energy Markets: Does Sequencing Matter? |
0 |
0 |
0 |
209 |
1 |
3 |
4 |
513 |
| Intertemporal Consistency Issues in Depletable Resources |
1 |
1 |
1 |
133 |
5 |
8 |
10 |
481 |
| Investment, Reprocurement and Franchise Contract Length in the British Railway Industry |
0 |
0 |
0 |
230 |
1 |
4 |
5 |
1,126 |
| Investment, Savings and Employment in the Long-Run |
0 |
0 |
0 |
62 |
1 |
1 |
4 |
343 |
| Issues and Options for Restructuring Electricity Supply Industries |
0 |
0 |
1 |
729 |
3 |
8 |
15 |
1,637 |
| Issues and options for restructuring electricity supply industries |
0 |
0 |
0 |
5 |
4 |
7 |
11 |
39 |
| Long-term Framework for Electricity Distribution Access Charges |
0 |
0 |
0 |
252 |
5 |
13 |
16 |
685 |
| Market Concentration and Competition in Eastern Europe |
0 |
0 |
0 |
320 |
1 |
3 |
5 |
1,258 |
| Market Design |
0 |
0 |
0 |
4 |
3 |
4 |
4 |
23 |
| Market design |
0 |
0 |
0 |
363 |
4 |
5 |
5 |
683 |
| Market design for a high-renewables European electricity system |
1 |
1 |
2 |
52 |
9 |
11 |
17 |
68 |
| Market design for a high-renewables European electricity system |
0 |
0 |
2 |
119 |
2 |
5 |
12 |
142 |
| Measuring inefficiency in international electricity trading |
0 |
0 |
0 |
46 |
6 |
9 |
10 |
71 |
| Measuring inefficiency in international electricity trading |
0 |
0 |
0 |
10 |
0 |
0 |
6 |
22 |
| Mediating Market Power in Electricity Networks |
0 |
0 |
0 |
5 |
1 |
2 |
4 |
54 |
| Mediating Market Power in Electricity Networks |
0 |
0 |
0 |
5 |
6 |
8 |
10 |
50 |
| Mediating Market Power in Electricity Networks |
0 |
0 |
0 |
0 |
2 |
4 |
6 |
8 |
| Mediating Market Power in Electricity Networks |
0 |
0 |
0 |
4 |
2 |
3 |
5 |
54 |
| Mediating Market Power in Electricity Networks |
0 |
0 |
0 |
0 |
2 |
5 |
5 |
5 |
| Missing Money and Missing Markets: Reliability, Capacity Auctions and Interconnectors |
0 |
0 |
1 |
115 |
6 |
9 |
15 |
323 |
| Missing Money and Missing Markets: Reliability, Capacity Auctions and Interconnectors |
0 |
1 |
1 |
12 |
1 |
7 |
8 |
67 |
| Nuclear Power: A Hedge against Uncertain Gas and Carbon Prices? |
0 |
0 |
0 |
6 |
1 |
1 |
3 |
35 |
| Nuclear Power: a Hedge against Uncertain Gas and Carbon Prices? |
0 |
0 |
1 |
323 |
2 |
4 |
10 |
897 |
| Oil Shortages, Climate Change and Collective Action |
0 |
0 |
0 |
4 |
2 |
2 |
2 |
17 |
| Oil Shortages, Climate Change and Collective Action |
0 |
0 |
0 |
114 |
6 |
8 |
12 |
207 |
| Policies for decarbonizing a liberalized power sector |
0 |
0 |
0 |
34 |
2 |
6 |
6 |
43 |
| Policies for decarbonizing a liberalized power sector |
0 |
0 |
1 |
1 |
4 |
7 |
10 |
20 |
| Policies for decarbonizing a liberalized power sector |
0 |
0 |
0 |
26 |
2 |
5 |
7 |
43 |
| Policies for decarbonizing a liberalized power sector |
0 |
0 |
0 |
37 |
4 |
8 |
9 |
72 |
| Pool Reform and Competition in Electricity, forthcoming in M. Beesley (ed.), Lectures on Regulation Series VII, London, Institute of Economic Affairs |
0 |
0 |
0 |
0 |
1 |
3 |
5 |
1,520 |
| Power Reform, Private Investment and Regional Co-operation |
0 |
0 |
0 |
2 |
2 |
2 |
2 |
14 |
| Power sector reform, private investment and regional co-operation |
0 |
0 |
0 |
281 |
7 |
11 |
11 |
718 |
| Predicting Market Power in Wholesale Electricity Markets |
1 |
1 |
2 |
157 |
1 |
8 |
21 |
240 |
| Predicting Market Power in Wholesale Electricity Markets |
0 |
1 |
1 |
196 |
5 |
10 |
12 |
335 |
| Predicting market power in wholesale electricity markets |
0 |
1 |
1 |
263 |
4 |
9 |
11 |
441 |
| Predicting market power in wholesale electricity markets |
0 |
1 |
2 |
8 |
5 |
9 |
13 |
42 |
| Pricing Carbon For Electricity Generation: National And International Dimensions |
0 |
0 |
0 |
216 |
2 |
3 |
5 |
485 |
| Pricing Carbon for Electricity Generation: National and International Dimensions |
0 |
0 |
0 |
3 |
0 |
2 |
7 |
24 |
| Pricing Electricity and Supporting Renewables in Heavily Energy Subsidized Economies |
0 |
0 |
0 |
1 |
1 |
3 |
5 |
23 |
| Pricing electricity and supporting renewables in Heavily Energy Subsidized Economies |
0 |
0 |
0 |
67 |
5 |
6 |
6 |
80 |
| Privatisation and Liberalisation of Network Utilities |
0 |
0 |
0 |
0 |
2 |
4 |
8 |
2,983 |
| Privatising Network Industries |
0 |
0 |
0 |
363 |
3 |
6 |
7 |
597 |
| Questioning the EU Target Electricity Model – how should it be adapted to deliver the Trilemma? |
0 |
0 |
1 |
51 |
2 |
8 |
10 |
81 |
| Questioning the EU Target Electricity Model – how should it be adapted to deliver the Trilemma? |
0 |
0 |
1 |
2 |
4 |
6 |
8 |
20 |
| RATIONAL EXPECTATIONS WITH MARKET POWER- THE PARADOX OF THE DISADVANTAGEOUS TARIFF ON OIL |
0 |
0 |
0 |
3 |
2 |
4 |
4 |
18 |
| ROAD TRANSPORT TAXATION IN DEVELOPING COUNTRIES |
0 |
0 |
0 |
1 |
4 |
5 |
8 |
1,432 |
| Rational Expectations With Market Power: The Paradox of the Disadvantageous Tariff |
0 |
0 |
0 |
0 |
3 |
6 |
7 |
233 |
| Rational Expectations with Market Power - The Paradox of the Disadvantageous Tariff on Oil |
0 |
0 |
0 |
6 |
0 |
4 |
5 |
176 |
| Reforming Competitive Electricity Markets to Meet Environmental Targets |
0 |
0 |
0 |
3 |
7 |
8 |
9 |
35 |
| Reforming Competitive Electricity Markets to Meet Environmental Targets |
0 |
0 |
0 |
207 |
3 |
7 |
9 |
342 |
| Reforming UK Energy Policy to Live Within Its Means |
1 |
1 |
1 |
1 |
4 |
7 |
8 |
21 |
| Reforming UK energy policy to live within its means |
0 |
0 |
0 |
70 |
6 |
8 |
9 |
87 |
| Regulation Games |
0 |
0 |
0 |
21 |
3 |
4 |
5 |
70 |
| Regulation Games |
0 |
0 |
0 |
0 |
2 |
3 |
3 |
200 |
| Regulation Games |
0 |
0 |
0 |
237 |
3 |
7 |
11 |
1,041 |
| Regulatory Challenges to European Electricity Liberalisation |
0 |
0 |
1 |
763 |
11 |
13 |
19 |
1,570 |
| Regulatory Challenges to European Electricity Liberalisation |
0 |
0 |
1 |
2 |
1 |
1 |
7 |
24 |
| Regulatory Policies and Reform in the Electricity Supply Industry |
0 |
0 |
0 |
0 |
3 |
5 |
5 |
662 |
| Road User Charges in Britain |
0 |
0 |
0 |
263 |
0 |
4 |
8 |
929 |
| Sequencing the Transition |
0 |
0 |
0 |
148 |
2 |
4 |
6 |
470 |
| Should Merchant Transmission Investment be Subject to a Must-offer Provision? |
0 |
0 |
0 |
135 |
3 |
7 |
9 |
433 |
| Should Merchant Transmission Investment be subject to a Mustoffer Provision? |
0 |
0 |
0 |
1 |
2 |
2 |
3 |
25 |
| Smoothing Primary Exporters' Price Risks: Bonds, Futures, Options and Insurance |
0 |
0 |
0 |
0 |
1 |
5 |
6 |
391 |
| Strengths and Weaknesses of the British Market Model |
0 |
0 |
0 |
21 |
0 |
1 |
1 |
34 |
| Strengths and Weaknesses of the British Market Model |
0 |
0 |
0 |
62 |
2 |
5 |
6 |
134 |
| Supply Function Equilibria: Step Functions and Continuous Representations |
0 |
0 |
2 |
120 |
6 |
14 |
18 |
1,177 |
| Supply Function Equilibria: Step Functions and Continuous Representations |
0 |
0 |
0 |
55 |
13 |
15 |
15 |
310 |
| Supply Function Equilibria: Step functions and continuous representations |
0 |
0 |
0 |
2 |
3 |
5 |
8 |
29 |
| Tax Reform, Trade Liberalisation and Industrial Restructuring in Hungary |
0 |
0 |
0 |
140 |
1 |
3 |
4 |
691 |
| Tax and Benefit Reform in Central and Eastern Europe |
1 |
1 |
2 |
339 |
1 |
2 |
5 |
838 |
| The Burden and Disincentive Effects of Hungarian Personal Taxes 1988-96 |
0 |
0 |
0 |
43 |
3 |
5 |
5 |
313 |
| The Choice of Techniques in a Dual Economy |
0 |
0 |
0 |
34 |
2 |
3 |
3 |
335 |
| The Cost of Carbon Leakage: Britain’s Carbon Price Support and Cross-border Electricity Trade |
0 |
0 |
0 |
24 |
3 |
4 |
5 |
74 |
| The Cost of Trade Distortion: Britain's Carbon Price Support and Cross-border Electricity Trade |
0 |
0 |
0 |
29 |
1 |
3 |
6 |
32 |
| The Effect of Protection on Manufactured Exports from Developing Countries |
0 |
0 |
0 |
70 |
1 |
4 |
5 |
506 |
| The Environmental Benefits from Road Pricing |
0 |
0 |
0 |
420 |
2 |
4 |
7 |
1,198 |
| The Final Hurdle?: Security of supply, the Capacity Mechanism and the role of interconnectors |
0 |
0 |
0 |
2 |
1 |
2 |
5 |
28 |
| The Final Hurdle?: Security of supply, the Capacity Mechanism and the role of interconnectors |
0 |
0 |
0 |
45 |
4 |
6 |
9 |
68 |
| The Fundamental Theorem of Road User Charges |
0 |
0 |
2 |
194 |
1 |
3 |
7 |
620 |
| The Impact of Unilateral Carbon Taxes on Cross-Border Electricity Trading |
0 |
0 |
0 |
31 |
4 |
9 |
16 |
77 |
| The Impact of a Carbon Tax on Cross-Border Electricity Trading (replaced with WP2005) |
0 |
0 |
0 |
9 |
3 |
8 |
9 |
29 |
| The Political Economy of Carbon Pricing: a Panel Analysis |
1 |
1 |
3 |
15 |
4 |
9 |
16 |
69 |
| The Privatisation of British Gas and the Possible Consequences for the European Gas Market |
0 |
0 |
0 |
427 |
4 |
7 |
9 |
3,204 |
| The Relationship Between Regulation and Competition Policy for Network Utilities |
0 |
0 |
0 |
5 |
2 |
4 |
8 |
32 |
| The Restructuring and Privatisation of the CEGB: Was It Worth It? |
0 |
0 |
0 |
0 |
1 |
6 |
11 |
4,259 |
| The Restructuring and Privatization of the U.K. Electricity Supply-Was It Worth It? |
1 |
1 |
2 |
45 |
4 |
7 |
20 |
110 |
| The Robustness of Agent-Based Models of Electricity Wholesale Markets |
0 |
0 |
0 |
2 |
1 |
1 |
1 |
10 |
| The Role of Public Enterprises in the National Economy |
0 |
0 |
0 |
0 |
0 |
0 |
6 |
10,800 |
| The Strategic Robustness of Mark-up Equilibria |
0 |
0 |
0 |
12 |
2 |
3 |
5 |
94 |
| The Supply Function Equilibrium and Its Policy Implications for Wholesale Electricity Auctions |
0 |
1 |
1 |
75 |
4 |
6 |
7 |
176 |
| The Supply Function Equilibrium and its Policy Implications for Wholesale Electricity Auctions |
0 |
1 |
1 |
170 |
6 |
12 |
12 |
374 |
| The benefits of integrating European electricity markets |
0 |
0 |
0 |
47 |
7 |
13 |
13 |
104 |
| The benefits of integrating European electricity markets |
0 |
0 |
0 |
6 |
2 |
7 |
11 |
37 |
| The cost of CO2 abatement from Britain's only PWR: Sizewell B |
0 |
0 |
0 |
9 |
2 |
4 |
5 |
19 |
| The cost of CO2 abatement from Britain’s only PWR: Sizewell B |
0 |
0 |
0 |
13 |
1 |
2 |
5 |
31 |
| The cost of uncoupling GB interconnectors |
0 |
0 |
1 |
28 |
4 |
6 |
11 |
67 |
| The cost of uncoupling GB interconnectors |
0 |
0 |
0 |
1 |
2 |
8 |
8 |
15 |
| The economics of air pollution from fossil fuels |
0 |
0 |
0 |
24 |
4 |
6 |
8 |
35 |
| The economics of air pollution from fossil fuels |
0 |
0 |
0 |
87 |
5 |
7 |
9 |
110 |
| The impact of a Carbon Tax on the CO2 emissions reduction of wind |
0 |
0 |
0 |
28 |
1 |
4 |
7 |
60 |
| The impact of a Carbon Tax on the CO2 emissions reduction of wind |
0 |
0 |
0 |
69 |
3 |
7 |
7 |
185 |
| The long-Run Equilibrium Impact of Intermittent Renewables on Wholesale Electricity Prices |
0 |
1 |
1 |
3 |
1 |
4 |
4 |
35 |
| The long-run equilibrium impact of intermittent renewables on wholesale electricity prices |
0 |
0 |
0 |
55 |
1 |
6 |
9 |
79 |
| The political economy of carbon pricing: a panel analysis |
0 |
0 |
1 |
110 |
4 |
6 |
10 |
173 |
| The private and social value of British electrical interconnectors |
0 |
0 |
0 |
12 |
6 |
7 |
9 |
31 |
| The private and social value of British electrical interconnectors |
0 |
0 |
0 |
16 |
5 |
8 |
8 |
59 |
| The relationship between regulation and competition policy for network utilities |
0 |
0 |
0 |
577 |
3 |
8 |
11 |
1,153 |
| The robustness of industrial commodity oligopoly pricing strategies |
0 |
0 |
0 |
42 |
5 |
7 |
8 |
78 |
| The robustness of industrial commodity oligopoly pricing strategies |
0 |
1 |
1 |
5 |
2 |
6 |
6 |
23 |
| The supply function equilibrium and its policy implications for wholesale electricity auctions |
0 |
0 |
0 |
0 |
11 |
12 |
13 |
34 |
| Time-Consistent Oil Import Tariffs |
0 |
0 |
0 |
67 |
4 |
6 |
6 |
461 |
| Transport policy for a post-Covid UK |
0 |
0 |
0 |
15 |
4 |
7 |
8 |
41 |
| Transport policy for a post-Covid UK |
0 |
0 |
0 |
3 |
3 |
6 |
8 |
14 |
| Transport policy for a post-Covid UK |
0 |
0 |
0 |
28 |
1 |
5 |
7 |
55 |
| UK Electricity Market Reform and the Energy Transition: Emerging Lessons |
0 |
0 |
1 |
29 |
5 |
7 |
15 |
52 |
| UK Electricity Market Reform and the Energy Transition: Emerging Lessons |
0 |
0 |
2 |
76 |
6 |
12 |
19 |
156 |
| Under-pricing electricity and the puzzle of regulatory accounting |
0 |
0 |
0 |
0 |
0 |
0 |
2 |
7 |
| Under-pricing electricity and the puzzle of regulatory accounting |
0 |
0 |
0 |
122 |
5 |
8 |
9 |
259 |
| Urban Congestion Charging: Theory, Practice and Environmental Consequences |
1 |
3 |
3 |
435 |
2 |
6 |
10 |
1,909 |
| Using Probabilistic Analysis to Value Power Generation Investments Under Uncertainty |
0 |
0 |
0 |
508 |
3 |
6 |
10 |
1,009 |
| Using Probabilistic Analysis to Value Power Generation Investments Under Uncertainty |
0 |
0 |
1 |
5 |
1 |
8 |
10 |
39 |
| Wage Rigidity, Implicit Contracts, Unemployment and Economic Efficiency |
0 |
0 |
0 |
210 |
1 |
5 |
9 |
950 |
| What future(s) for liberalized electricity markets: efficient, equitable or innovative? |
0 |
0 |
0 |
86 |
3 |
9 |
11 |
181 |
| What future(s) for liberalized electricity markets: efficient, equitable or innovative? |
0 |
0 |
0 |
1 |
0 |
7 |
8 |
19 |
| What is the target battery cost at which Battery Electric Vehicles are socially cost competitive? |
0 |
0 |
0 |
30 |
1 |
2 |
4 |
82 |
| What is the target battery cost at which Battery Electric Vehicles are socially cost competitive? |
0 |
0 |
0 |
3 |
1 |
1 |
3 |
13 |
| When is a carbon price floor desirable? |
0 |
0 |
1 |
71 |
3 |
7 |
12 |
176 |
| When is a carbon price floor desirable? |
0 |
0 |
1 |
24 |
5 |
10 |
13 |
59 |
| Where the Champsaur Commission Has Got It Wrong |
0 |
0 |
0 |
0 |
1 |
3 |
4 |
32 |
| Why Tax Energy? Towards a More Rational Energy Policy |
0 |
0 |
1 |
861 |
4 |
11 |
14 |
1,604 |
| Wind, water and wires: evaluating joint wind and interconnector capacity expansions in hydro-rich regions |
0 |
0 |
0 |
12 |
8 |
9 |
13 |
35 |
| Total Working Papers |
11 |
30 |
101 |
24,155 |
648 |
1,233 |
1,815 |
94,711 |
| Journal Article |
File Downloads |
Abstract Views |
| Last month |
3 months |
12 months |
Total |
Last month |
3 months |
12 months |
Total |
| A NUCLEAR FUTURE? UK GOVERNMENT POLICY AND THE ROLE OF THE MARKET |
0 |
0 |
0 |
20 |
2 |
2 |
4 |
82 |
| A theorem on the measurement of inequality |
0 |
1 |
3 |
200 |
1 |
3 |
5 |
377 |
| A unit commitment and economic dispatch model of the GB electricity market – Formulation and application to hydro pumped storage |
0 |
0 |
0 |
2 |
5 |
9 |
13 |
30 |
| Agricultural pricing and public investment |
0 |
0 |
0 |
25 |
1 |
2 |
4 |
88 |
| Allocating Transmission to Mitigate Market Power in Electricity Markets |
0 |
0 |
0 |
0 |
6 |
9 |
11 |
322 |
| Alternative Entry Paths: The Build Or Buy Decision |
0 |
0 |
0 |
4 |
0 |
1 |
6 |
24 |
| Alternative Entry Paths: The Build or Buy Decision |
0 |
0 |
0 |
0 |
0 |
1 |
4 |
500 |
| Analytical Screens for Electricity Mergers |
0 |
0 |
0 |
66 |
3 |
5 |
7 |
201 |
| Cartels, storage, and the suppression of futures markets |
0 |
0 |
0 |
39 |
0 |
0 |
0 |
120 |
| Charging for Roads |
0 |
0 |
0 |
0 |
2 |
2 |
5 |
269 |
| Che cosa pu? imparare l'Europa dalle privatizzazioni britanniche |
0 |
0 |
0 |
3 |
2 |
2 |
4 |
45 |
| Climate Change Policy and Its Effect on Market Power in the Gas Market |
0 |
0 |
0 |
78 |
9 |
13 |
15 |
285 |
| Commodity Price Stabilization in Imperfect or Cartelized Markets |
0 |
0 |
0 |
112 |
0 |
2 |
4 |
509 |
| Comparing Investments in New Transport Infrastructure: Roads versus Railways? |
0 |
0 |
0 |
0 |
2 |
5 |
6 |
393 |
| Competition in the British Electricity Spot Market |
0 |
5 |
24 |
1,493 |
6 |
23 |
70 |
3,874 |
| Competition in the Electricity Industry in England and Wales |
0 |
0 |
0 |
1 |
2 |
5 |
7 |
672 |
| Competition, Contracts, and Entry in the Electricity Spot Market |
1 |
1 |
3 |
457 |
4 |
7 |
14 |
1,191 |
| Contracting for Wind Generation |
0 |
1 |
1 |
20 |
2 |
5 |
5 |
87 |
| Cropsharing Tenancy in Agriculture: Comment |
0 |
0 |
0 |
26 |
3 |
7 |
9 |
219 |
| Determining the regulatory asset base for utility price regulation |
0 |
0 |
1 |
1,035 |
2 |
2 |
4 |
2,910 |
| Disadvantageous Oil Tariffs and Dynamic Consistency |
0 |
0 |
0 |
22 |
4 |
9 |
10 |
689 |
| Dynamically Consistent Oil Import Tariffs |
0 |
0 |
0 |
30 |
4 |
6 |
9 |
337 |
| Economic reform in Europe: integrating and liberalizing the market for services |
0 |
0 |
0 |
65 |
3 |
6 |
8 |
184 |
| Electricity liberalization in Britain: The quest for a satisfactory wholesale market design |
0 |
1 |
2 |
74 |
6 |
11 |
18 |
318 |
| Electricity transmission arrangements in Great Britain: Time for change? |
0 |
0 |
1 |
29 |
6 |
10 |
11 |
115 |
| Electricity transmission: An overview of the current debate |
0 |
0 |
2 |
237 |
8 |
13 |
21 |
572 |
| Evaluating the case for supporting renewable electricity |
0 |
1 |
4 |
18 |
2 |
6 |
11 |
96 |
| Evolution of electricity markets: Does sequencing matter? |
0 |
0 |
0 |
72 |
0 |
1 |
2 |
333 |
| Experimental approach to the determination of the demand for public goods: A comment |
0 |
0 |
0 |
13 |
1 |
2 |
2 |
52 |
| Financial Instruments for Consumption Smoothing by Commodity-Dependent Exporters |
0 |
0 |
0 |
1 |
1 |
1 |
1 |
13 |
| Fuel mix diversification incentives in liberalized electricity markets: A Mean-Variance Portfolio theory approach |
1 |
1 |
4 |
296 |
7 |
11 |
23 |
688 |
| Growth, Externalities and Taxation |
0 |
0 |
0 |
0 |
1 |
4 |
5 |
132 |
| High renewable electricity penetration: Marginal curtailment and market failure under “subsidy-free” entry |
0 |
0 |
2 |
2 |
1 |
6 |
11 |
15 |
| Horizontal Inequity and Vertical Redistribution with Indirect Taxes: The Greek Case* |
0 |
0 |
0 |
24 |
3 |
3 |
4 |
101 |
| Hydropower Economics by Førsund, Finn R |
0 |
0 |
0 |
0 |
1 |
1 |
1 |
6 |
| Indirect Taxation in Greece: Evaluation and Possible Reform |
0 |
0 |
0 |
83 |
0 |
2 |
4 |
338 |
| Integrating electricity transmission systems |
0 |
0 |
0 |
68 |
2 |
2 |
2 |
158 |
| Introduction |
1 |
1 |
1 |
3 |
1 |
3 |
5 |
56 |
| Investment Incentives and Electricity Market Design: the British Experience |
0 |
0 |
1 |
283 |
7 |
11 |
19 |
590 |
| Investment, Savings and Employment in the Long-Run |
0 |
0 |
0 |
31 |
4 |
4 |
6 |
164 |
| Market Concentration and Competition in Eastern Europe |
0 |
0 |
1 |
11 |
4 |
4 |
8 |
41 |
| Market design for a high-renewables European electricity system |
2 |
3 |
10 |
102 |
12 |
25 |
55 |
354 |
| Market design for a large share of wind power |
0 |
0 |
0 |
168 |
2 |
6 |
6 |
348 |
| Measuring inefficiency in international electricity trading |
0 |
0 |
1 |
4 |
4 |
6 |
10 |
27 |
| Missing money and missing markets: Reliability, capacity auctions and interconnectors |
0 |
0 |
6 |
49 |
3 |
12 |
30 |
177 |
| Multi-level planning: Case studies in Mexico: L.M. Goreux and A.S. Manne, eds., (North-Holland Publishing Company, Amsterdam, 1973) 556 pp |
0 |
0 |
1 |
61 |
2 |
3 |
4 |
157 |
| National Energy and Climate Plans for the island of Ireland: wind curtailment, interconnectors and storage |
0 |
0 |
0 |
6 |
1 |
2 |
7 |
19 |
| Network capacity auctions: promise and problems |
0 |
0 |
1 |
75 |
1 |
9 |
12 |
191 |
| New Approaches in Agricultural Policy Research: Discussion |
0 |
0 |
0 |
0 |
5 |
6 |
8 |
16 |
| Nuclear Power: A Hedge against Uncertain Gas and Carbon Prices? |
0 |
0 |
0 |
46 |
0 |
9 |
15 |
289 |
| OPEC and the U.S. Oil Import Tariff |
0 |
0 |
0 |
217 |
1 |
4 |
5 |
1,900 |
| Oil Prices, Cartels, and the Problem of Dynamic Inconsistency |
0 |
0 |
0 |
245 |
3 |
7 |
12 |
732 |
| On the accuracy of the mean-variance approximation for futures markets |
0 |
0 |
0 |
44 |
1 |
1 |
2 |
141 |
| On the desirability of input taxes |
0 |
0 |
3 |
65 |
2 |
7 |
13 |
198 |
| Optimal Commodity Stock-piling Rules |
0 |
0 |
0 |
86 |
4 |
7 |
9 |
492 |
| Optimal Trade Taxes on Agriculture in Developing Countries |
0 |
0 |
0 |
101 |
3 |
3 |
3 |
452 |
| Optimal tariffs on exhaustible resources |
0 |
0 |
0 |
145 |
2 |
2 |
2 |
261 |
| Optimal tax rates and tax design during systemic reform |
0 |
0 |
0 |
199 |
0 |
2 |
3 |
406 |
| Pareto Inferior Trade |
1 |
1 |
3 |
402 |
12 |
47 |
68 |
1,420 |
| Policies for decarbonizing a liberalized power sector |
0 |
0 |
0 |
1 |
3 |
7 |
10 |
42 |
| Power Markets and Market Power |
0 |
0 |
1 |
139 |
3 |
5 |
8 |
888 |
| Preemptive Patenting and the Persistence of Monopoly |
2 |
11 |
39 |
1,721 |
8 |
38 |
116 |
4,252 |
| Preemptive Patenting and the Persistence of Monopoly: Reply |
0 |
0 |
0 |
95 |
5 |
8 |
13 |
364 |
| Pricing Electricity and Supporting Renewables in Heavily Energy Subsidized Economies |
0 |
0 |
0 |
8 |
0 |
1 |
2 |
71 |
| Pricing and Congestion: Economic Principles Relevant to Pricing Roads |
0 |
0 |
0 |
1 |
5 |
8 |
13 |
1,556 |
| Privatisation and liberalisation of network utilities |
0 |
2 |
5 |
268 |
3 |
11 |
19 |
516 |
| Problems of liberalising the electricity industry |
2 |
3 |
10 |
284 |
6 |
15 |
27 |
635 |
| Public Policy in the Dual Economy |
0 |
0 |
0 |
21 |
1 |
4 |
5 |
116 |
| Redistributive impact of indirect tax reforms: Greece, 1988-2002 |
0 |
0 |
0 |
0 |
1 |
3 |
7 |
271 |
| Reform in Hungary: Sequencing and privatisation |
0 |
0 |
0 |
76 |
2 |
7 |
9 |
177 |
| Reforming Competitive Electricity Markets to Meet Environmental Targets |
0 |
0 |
1 |
32 |
1 |
4 |
8 |
137 |
| Regulating Unbundled Network Utilities |
0 |
0 |
1 |
80 |
8 |
12 |
17 |
206 |
| Regulation and competition policy: longer-term boundaries |
0 |
0 |
0 |
54 |
4 |
5 |
5 |
133 |
| Removing coal subsidies: Implications for European electricity markets |
0 |
0 |
0 |
14 |
3 |
5 |
6 |
64 |
| Restructuring and privatizing electric utilities in Eastern Europe |
0 |
0 |
0 |
23 |
5 |
12 |
13 |
83 |
| Risk Aversion, Supply Response, and the Optimality of Random Prices: A Diagrammatic Analysis |
0 |
0 |
0 |
59 |
0 |
4 |
6 |
207 |
| Risk Sharing, Sharecropping and Uncertain Labour Markets |
0 |
1 |
1 |
139 |
1 |
3 |
7 |
331 |
| Road Damage Externalities and Road User Charges |
0 |
0 |
1 |
425 |
2 |
3 |
11 |
2,202 |
| Road User Charges in Britain |
0 |
0 |
0 |
153 |
3 |
4 |
7 |
471 |
| Road taxes, road user charges and earmarking |
0 |
0 |
1 |
201 |
4 |
6 |
22 |
714 |
| Royal Commission Report on Transport and the Environment--Economic Effects of Recommendations |
0 |
0 |
0 |
81 |
1 |
2 |
3 |
383 |
| Security of Supply, the Role of Interconnectors and Option Values: insights from the GB Capacity Auction |
0 |
0 |
3 |
55 |
4 |
6 |
15 |
170 |
| Setting the Price of Oil in a Distorted Economy |
0 |
0 |
1 |
47 |
5 |
7 |
9 |
246 |
| Shifting demand and supply over time and space to manage intermittent generation: The economics of electrical storage |
3 |
3 |
5 |
44 |
6 |
11 |
18 |
163 |
| Should Carbon Taxes Be Additional to Other Transport Fuel Taxes? |
0 |
0 |
0 |
25 |
2 |
5 |
7 |
211 |
| Should merchant transmission investment be subject to a must-offer provision? |
0 |
0 |
0 |
52 |
2 |
7 |
8 |
163 |
| Smoothing Primary Exporters' Price Risks: Bonds, Futures, Options and Insurance |
0 |
0 |
0 |
63 |
4 |
6 |
7 |
312 |
| Stochastic Limit Pricing |
0 |
0 |
0 |
32 |
1 |
3 |
5 |
237 |
| Supply function equilibria: Step functions and continuous representations |
0 |
0 |
1 |
45 |
5 |
10 |
13 |
315 |
| Tales of two islands – Lessons for EU energy policy from electricity market reforms in Britain and Ireland |
0 |
1 |
5 |
43 |
2 |
7 |
19 |
126 |
| Tax and expenditure policies in Hungary* |
0 |
0 |
0 |
10 |
2 |
3 |
5 |
50 |
| The Choice of Techniques and the Optimality of Market Equilibrium with Rational Expectations |
0 |
0 |
0 |
107 |
1 |
5 |
14 |
509 |
| The Distributional Impact of Price Changes in Hungary and the United Kingdom |
0 |
0 |
0 |
105 |
5 |
5 |
5 |
379 |
| The Dynamic Efficiency of Regulatory Constitutions |
0 |
0 |
0 |
201 |
3 |
7 |
10 |
543 |
| The Evolution of the Tax Structure of a Reforming Transitional Economy: Hungary 1988–98 |
0 |
0 |
2 |
48 |
2 |
2 |
5 |
176 |
| The Impact of EC Environmental Policy on British Coal |
0 |
0 |
0 |
0 |
3 |
3 |
4 |
245 |
| The Impact of Structural and Contractual Arrangements on a Vertically Separated Railway |
0 |
1 |
1 |
50 |
3 |
13 |
17 |
200 |
| The Impact of Sulfur Limits on Fuel Demand and Electricity Prices in Britain |
0 |
0 |
0 |
4 |
5 |
5 |
5 |
55 |
| The Impact of a Carbon Tax on the CO2 Emissions Reduction of Wind |
0 |
0 |
1 |
16 |
7 |
10 |
14 |
113 |
| The Isolation Paradox and the Discount Rate for Benefit-Cost Analysis: A Comment |
0 |
0 |
0 |
113 |
2 |
2 |
3 |
484 |
| The Open-Loop von Stackelberg Equilibrium in the Cartel versus Fringe Model: A Reply |
0 |
0 |
0 |
90 |
2 |
3 |
5 |
541 |
| The Political Economy of a Carbon Price Floor for Power Generation |
0 |
0 |
0 |
82 |
10 |
14 |
22 |
313 |
| The Restructuring and Privatisation of Britain's CEGB—Was It Worth It? |
1 |
4 |
6 |
577 |
4 |
10 |
18 |
1,748 |
| The Robustness of Equilibrium Analysis in the Dual Economy |
0 |
0 |
0 |
9 |
1 |
2 |
9 |
101 |
| The Role of Public Enterprises in the National Economy |
0 |
0 |
0 |
2 |
0 |
1 |
3 |
15 |
| The Theory of Commodity Price Stabilisation Rules: Welfare Impacts and Supply Responses |
1 |
2 |
2 |
315 |
4 |
6 |
10 |
734 |
| The Theory of Food Price Stabilisation |
0 |
1 |
4 |
272 |
1 |
3 |
17 |
1,502 |
| The benefits of integrating European electricity markets |
0 |
1 |
2 |
38 |
4 |
11 |
30 |
182 |
| The cost of uncoupling |
0 |
0 |
0 |
3 |
1 |
1 |
2 |
9 |
| The cost of uncoupling GB interconnectors |
1 |
1 |
2 |
4 |
10 |
11 |
13 |
32 |
| The importance of malleable capital in optimal growth models |
0 |
0 |
0 |
18 |
0 |
0 |
1 |
125 |
| The political economy of carbon pricing: a panel analysis |
0 |
4 |
14 |
110 |
6 |
20 |
44 |
302 |
| The private and social value of British electrical interconnectors |
0 |
0 |
2 |
5 |
2 |
5 |
10 |
21 |
| The regulation of the gas industry: lessons from electricity |
0 |
0 |
0 |
0 |
1 |
3 |
5 |
310 |
| The regulator's review of the English Electricity Pool |
0 |
0 |
0 |
63 |
1 |
5 |
8 |
243 |
| The strategic robustness of oligopoly electricity market models |
0 |
1 |
3 |
23 |
2 |
8 |
13 |
94 |
| The supply function equilibrium and its policy implications for wholesale electricity auctions |
0 |
1 |
2 |
66 |
11 |
14 |
17 |
215 |
| The theory of environmental policy: W.J. Baumol and W.E. Oates (Prentice Hall, Englewood Cliffs, NJ, 1975) pp. xii+272, [UK pound]8.25 |
1 |
1 |
2 |
1,158 |
5 |
7 |
18 |
2,960 |
| Towards a green energy economy? The EU Energy Union’s transition to a low-carbon zero subsidy electricity system – Lessons from the UK’s Electricity Market Reform |
0 |
3 |
6 |
29 |
6 |
11 |
19 |
146 |
| Transformation in mature versus emerging economies: Why has Hungary been less successful than China? |
0 |
0 |
0 |
70 |
2 |
4 |
5 |
692 |
| UK Electricity Market Reform and the Energy Transition: Emerging Lessons |
1 |
2 |
7 |
28 |
9 |
17 |
35 |
154 |
| Uncertain Innovation and the Persistence of Monopoly: Comment |
0 |
0 |
0 |
88 |
3 |
7 |
10 |
312 |
| Wage Rigidity, Implicit Contracts, Unemployment and Economic Efficiency |
0 |
0 |
0 |
103 |
7 |
8 |
16 |
412 |
| What future(s) for liberalized electricity markets: efficient, equitable or innovative? |
0 |
1 |
1 |
8 |
3 |
9 |
15 |
70 |
| What is needed for battery electric vehicles to become socially cost competitive? |
0 |
0 |
0 |
14 |
3 |
3 |
6 |
69 |
| When Do Futures Destabilize Spot Prices? |
0 |
0 |
0 |
119 |
3 |
8 |
11 |
343 |
| Where the Champsaur Commission Has Got It Wrong |
0 |
0 |
0 |
56 |
3 |
5 |
6 |
133 |
| Why Tax Energy? Towards a More Rational Policy |
0 |
0 |
1 |
18 |
1 |
4 |
5 |
131 |
| Total Journal Articles |
18 |
60 |
208 |
15,261 |
414 |
863 |
1,532 |
55,201 |