| Working Paper |
File Downloads |
Abstract Views |
| Last month |
3 months |
12 months |
Total |
Last month |
3 months |
12 months |
Total |
| A Combined Forecast-Inventory Control Procedure for Spare Parts |
0 |
0 |
0 |
0 |
1 |
1 |
1 |
11 |
| A Combined Forecast-Inventory Control Procedure for Spare Parts |
0 |
0 |
0 |
17 |
0 |
0 |
1 |
117 |
| A Note on the Kinks at the Mean Variance Frontier |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
3 |
| A Note on the Kinks at the Mean Variance Frontier |
0 |
0 |
0 |
23 |
1 |
1 |
1 |
106 |
| A Simple Approximation to the Convolution of Gamma Distributions (Revision of DP 2006-27) |
0 |
0 |
0 |
77 |
0 |
0 |
0 |
131 |
| A Simple Approximation to the Convolution of Gamma Distributions (Revision of DP 2006-27) |
0 |
0 |
0 |
0 |
1 |
2 |
3 |
6 |
| A simplified MOLP algorithm: The MOLP-S procedure |
0 |
0 |
0 |
7 |
0 |
1 |
2 |
34 |
| A simplified MOLP algorithm: The MOLP-S procedure |
0 |
0 |
0 |
0 |
0 |
1 |
2 |
3 |
| An Experimental Comparison of Four Methods for Assessing Judgemental Distributions |
0 |
0 |
0 |
0 |
1 |
1 |
1 |
2 |
| An Experimental Comparison of Four Methods for Assessing Judgemental Distributions |
0 |
0 |
0 |
0 |
0 |
1 |
2 |
19 |
| Assessing the Effects of using Demand Parameters Estimates in Inventory Control |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
3 |
| Assessing the Effects of using Demand Parameters Estimates in Inventory Control |
0 |
0 |
0 |
5 |
0 |
1 |
1 |
28 |
| Comparison of bias-reducing methods for estimating the parameter in dilution series |
0 |
0 |
0 |
1 |
0 |
0 |
0 |
12 |
| Comparison of bias-reducing methods for estimating the parameter in dilution series |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
3 |
| Differentiability properties of the efficient (u,q2)-set in the Markowitz portfolio selection method |
0 |
0 |
0 |
0 |
1 |
2 |
2 |
3 |
| Differentiability properties of the efficient (u,q2)-set in the Markowitz portfolio selection method |
0 |
0 |
1 |
3 |
0 |
2 |
3 |
16 |
| Estimating Mean and Variance Through Quantiles: An Experimental Comparison of Different Methods |
0 |
0 |
0 |
3 |
0 |
0 |
0 |
30 |
| Estimating Mean and Variance Through Quantiles: An Experimental Comparison of Different Methods |
0 |
0 |
0 |
0 |
0 |
0 |
2 |
5 |
| Exact Fill Rates for (R, s, S) Inventory Control With Gamma Distributed Demand |
0 |
0 |
0 |
24 |
0 |
1 |
1 |
95 |
| Exact Fill Rates for (R, s, S) Inventory Control With Gamma Distributed Demand |
0 |
0 |
0 |
1 |
1 |
4 |
7 |
14 |
| Hierarchical Estimation as Basis for Hierarchical Forecasting |
0 |
0 |
0 |
8 |
0 |
0 |
0 |
17 |
| Hierarchical Estimation as Basis for Hierarchical Forecasting |
0 |
0 |
1 |
2 |
0 |
0 |
2 |
4 |
| How to Determine the Order-up-to Level When Demand is Gamma Distributed with Unknown Parameters |
0 |
0 |
0 |
0 |
0 |
1 |
1 |
6 |
| How to Determine the Order-up-to Level When Demand is Gamma Distributed with Unknown Parameters |
0 |
0 |
0 |
9 |
0 |
2 |
3 |
51 |
| Improved Spare Parts Inventory Management: A Case Study |
0 |
0 |
0 |
103 |
0 |
0 |
1 |
480 |
| Improved Spare Parts Inventory Management: A Case Study |
0 |
0 |
0 |
7 |
1 |
1 |
3 |
53 |
| Inventory Control: The Impact of Unknown Demand Distribution |
0 |
0 |
0 |
0 |
1 |
1 |
1 |
11 |
| Inventory Control: The Impact of Unknown Demand Distribution |
0 |
0 |
0 |
12 |
1 |
1 |
1 |
62 |
| Investigating several alternatives for estimating the compound lead time demand in an (s,Q) inventory model |
0 |
0 |
0 |
0 |
0 |
1 |
2 |
3 |
| Investigating several alternatives for estimating the compound lead time demand in an (s,Q) inventory model |
0 |
0 |
0 |
1 |
0 |
0 |
0 |
20 |
| Investigating several alternatives for estimating the lead time demand distribution in a continuous review inventory model |
0 |
0 |
0 |
0 |
2 |
4 |
5 |
6 |
| Modelling (s,Q) inventory systems: Parametric versus non-parametric approximations for the lead time demand distributions |
0 |
0 |
0 |
10 |
1 |
2 |
2 |
32 |
| Modified Normal Demand Distributions in (R,S)-Inventory Models |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
| Modified Normal Demand Distributions in (R,S)-Inventory Models |
0 |
0 |
0 |
6 |
0 |
1 |
3 |
21 |
| New Proposals for the Validation of Trace-Driven Simulations |
0 |
0 |
0 |
0 |
0 |
1 |
1 |
1 |
| New Proposals for the Validation of Trace-Driven Simulations |
0 |
0 |
0 |
0 |
0 |
1 |
1 |
10 |
| On the interaction between forecasting and inventory control |
0 |
0 |
0 |
1 |
0 |
0 |
0 |
4 |
| On the interaction between forecasting and inventory control |
0 |
0 |
0 |
33 |
1 |
2 |
2 |
82 |
| Production Planning and Inventory Control in the Pre-deco Industry |
0 |
0 |
0 |
3 |
1 |
1 |
2 |
15 |
| Production Planning and Inventory Control in the Pre-deco Industry |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
| Redesigning storage assignment and order-picking policies of a miniload AS/RS system: A case study |
0 |
0 |
0 |
3 |
1 |
2 |
4 |
18 |
| Repeated Audit Controls |
0 |
0 |
0 |
3 |
0 |
0 |
0 |
24 |
| Repeated Audit Controls |
0 |
0 |
0 |
0 |
0 |
1 |
1 |
3 |
| Simple Expressions for Safety Factors in Inventory Control |
0 |
0 |
2 |
25 |
0 |
2 |
4 |
68 |
| Simple Expressions for Safety Factors in Inventory Control |
0 |
0 |
0 |
2 |
0 |
0 |
2 |
9 |
| Simulating an (R,s,S) Inventory System |
0 |
0 |
0 |
8 |
1 |
3 |
3 |
43 |
| Simulating an (R,s,S) Inventory System |
0 |
0 |
0 |
1 |
0 |
0 |
1 |
4 |
| Two-Step Sequential Sampling |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
4 |
| Two-Step Sequential Sampling |
0 |
0 |
0 |
3 |
0 |
2 |
3 |
41 |
| Two-Step Sequential Sampling for Gamma Distributions |
0 |
0 |
0 |
3 |
0 |
1 |
2 |
12 |
| Two-Step Sequential Sampling for Gamma Distributions |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
2 |
| Total Working Papers |
0 |
0 |
4 |
404 |
16 |
48 |
81 |
1,749 |