Access Statistics for Mario Vanhoucke

Author contact details at EconPapers.

Working Paper File Downloads Abstract Views
Last month 3 months 12 months Total Last month 3 months 12 months Total
A Bi-Population Based Genetic Algorithm for the Resource-Constrained Project Scheduling Problem 0 0 0 123 0 0 0 383
A Bi-Population Based Genetic Algorithm for the Resource-Constrained Project Scheduling Problem 0 0 0 105 0 0 5 314
A Comparison and Hybridization of Crossover Operators for the Nurse Scheduling Problem 0 0 0 118 0 1 1 345
A Comparison of Different Project Duration Forecasting Methods using Earned Value Metrics 1 2 6 653 1 2 18 2,381
A DECOMPOSITION-BASED HEURISTIC FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM 0 0 0 222 0 0 0 596
A Genetic Algorithm for the Multi-Mode Resource-Constrained Project Scheduling Problem 1 1 1 389 1 2 4 1,116
A Genetic Algorithm for the Nurse Rerostering Problem 0 0 2 109 0 0 5 223
A Genetic Algorithm for the Single Machine Maximum Lateness Problem 0 0 1 49 0 0 1 124
A Hybrid Scatter Search / Electromagnetism Meta-Heuristic for Project Scheduling 0 0 0 89 0 0 0 333
A Hybrid Scatter Search Heuristic for Personalized Crew Rostering in the Airline Industry 0 0 0 142 0 0 0 382
A comparison of different project duration forecasting methods using earned value metrics 0 0 1 638 0 2 5 2,638
A comparison of priority rules for the job shop scheduling problem under different flow time- and tardiness-related objective functions 0 0 1 58 0 1 5 221
A finite capacity production scheduling procedure for a Belgian steel company 0 0 0 135 0 0 1 555
A finite capacity production scheduling procedure for a belgian steel company 0 0 0 70 0 0 1 340
A genetic algorithm to investigate the trade-off between project lead time and net present value 0 0 0 68 1 1 1 246
A hybrid electromagnetism-like/tabu search procedure for the single machine scheduling problem with a maximum lateness objective 0 0 0 18 0 0 0 76
A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family 0 0 0 7 1 1 1 61
A hybrid job shop procedure for a Belgian manufacturing company producing industrial wheels and castors in rubber 0 0 0 17 0 1 3 126
A hybrid scatter search / electromagnetism meta-heuristic for project scheduling 0 0 0 131 0 0 0 446
A hybrid single and dual population search procedure for the job shop scheduling problem 0 0 0 7 0 0 0 34
A scatter search procedure for maximizing the net present value of a project under renewable resource constraints 0 0 1 54 0 1 2 192
A scatter search procedure for maximizing the net present value of a project under renewable resource constraints 0 0 0 64 0 0 0 205
A simulation analysis of interactions between errors in costing system design 0 0 1 231 0 0 6 685
A simulation and evaluation of earned value metrics to forecast the project duration 1 1 4 869 1 1 11 2,601
AN ELECTROMAGNETISM META-HEURISTIC FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM 0 0 0 145 0 0 0 421
An Artificial Immune System Algorithm for the Resource Availability Cost Problem 0 0 1 29 0 0 1 67
An Artificial Immune System based approach for solving the Nurse Re-rostering Problem 0 0 0 23 0 0 2 74
An Artificial Immune System for the Multi-Mode Resource-Constrained Project Scheduling Problem 0 0 0 62 0 0 0 240
An Electromagnetic Meta-Heuristic for the Nurse Scheduling Problem 0 0 0 184 0 0 1 486
An Experimental Investigation of Metaheuristics for the Multi-Mode Resource-Constrained Project Scheduling Problem on New Dataset Instances 0 0 0 41 1 1 2 89
An Invasive Weed Optimization Algorithm for the Resource Availability Cost Problem 0 0 1 187 1 1 3 643
An efficient hybrid search algorithm for various optimization problems 0 0 0 111 0 0 1 339
An electromagnetic time/cost trade-off optimization in project scheduling 0 0 0 108 0 0 1 441
Analyzing the Nursing Organizational Structure and Process from a Scheduling Perspective 0 0 0 465 0 0 2 2,403
Automatic Personalized Crew Rostering at Brussels Airlines 0 0 0 37 0 0 2 133
Branching Strategies in a Branch-and-Price Approach for a Multiple Objective Nurse Scheduling Problem 0 0 0 91 0 1 2 293
Characterisation and Generation of Nurse Scheduling Problem Instances 0 0 0 305 0 0 1 1,079
Comparing the accuracy of ABC and time-driven ABC in complex and dynamic environments: a simulation analysis 0 0 1 339 0 0 8 1,041
Days on and days off scheduling of pilots under a variable workload 0 0 0 39 0 0 1 117
Improved project time performance using activity sensitivity and network topology information 0 0 0 51 0 0 1 318
Integrating the Nurse Staffing Decision and the Shift Scheduling Decision: Case Study and Policy Analysis 0 0 3 228 0 0 4 798
Introducing Learning Effects in Resource-constrained Project Scheduling 0 0 1 52 0 0 2 189
Introducing optimisation techniques to students: an exam case distribution model 0 0 0 12 0 0 0 61
Meta-Heuristic resource constrained project scheduling: solution space restrictions and neighbourhood extensions 0 0 0 41 0 0 0 174
Meta-heuristic resource-constrained project scheduling:solution space restrictions and neighbourhood extensions 0 0 0 194 0 0 0 641
Multi-mode resource constrained pro ject scheduling using RCPSP and SAT solvers 0 0 0 136 0 0 1 496
NEW COMPUTATIONAL RESULTS FOR THE DISCRETE TIME/COST TRADE-OFF PROBLEM WITH TIME-SWITCH CONSTRAINTS 0 0 0 88 0 0 0 539
New Computational Results for the Nurse Scheduling Problem: A Scatter Search Algorithm 0 0 0 152 0 0 0 444
New computational results for the discrete time/cost trade-off problem with time-switch constraints 0 0 0 185 0 0 0 644
New computational results for the nurse scheduling problem: A scatter search algorithm 1 1 1 93 1 1 1 285
ON THE MORPHOLOGICAL STRUCTURE OF A NETWORK 0 0 0 60 0 0 0 221
OPTIMAL DUE DATE ASSIGNMENT IN PROJECT SCHEDULING 1 1 1 170 1 1 1 606
On the design of custom packs: Grouping of medical disposable items for surgical procedures 0 0 0 31 0 0 0 158
On the morphological structure of a network 0 0 0 47 0 1 1 232
Optimal due date assignment in project scheduling 0 0 0 213 0 0 0 750
Pre-emptive resource-constrained project scheduling with setup times 0 0 0 95 0 1 1 714
Pre-emptive resource-constrained project scheduling with setup times 0 0 0 61 0 0 0 209
Reconstructing Nurse Schedules: Managerial Insights and Policy Decisions 0 0 0 29 0 0 1 111
Solution representation, diversity and space reduction: A computational experiment with meta-heuristics 0 0 0 24 0 0 1 66
THE DISCRETE TIME/COST TRADE-OFF PROBLEM UNDER VARIOUS ASSUMPTIONS EXACT AND HEURISTIC PROCEDURES 0 0 1 309 0 0 5 1,332
The Impact of Incorporating Nurse-Specific Characteristics in a Cyclical Scheduling Approach 0 0 1 56 0 0 1 233
The effect of project schedule adherence and rework on the duration forecast accuracy of earned value metrics 0 0 2 218 0 1 6 1,204
The impact of various activity assumptions on the lead-time and resource utilization of resource-constrained projects 0 0 0 29 0 0 0 147
The impact of various activity assumptions on the lead-time and resource utilization of resource-constrained projects 0 0 0 56 0 0 0 321
Truncated branch-and-bound guided meta-heuristics for the unrelated parallel machine scheduling problem 0 0 0 24 0 0 0 95
Using Resource Scarceness Characteristics to Solve the Multi-Mode Resource-Constrained Project Scheduling Problem 0 0 0 52 0 0 1 163
WORK CONTINUITY CONSTRAINTS IN PROJECT SCHEDULING 0 0 0 187 0 1 6 1,707
WORK CONTINUITY IN A REAL-LIFE SCHEDULE: THE WESTERSCHELDE TUNNEL 0 0 0 97 0 0 0 527
Total Working Papers 5 6 31 9,522 9 22 130 35,874


Journal Article File Downloads Abstract Views
Last month 3 months 12 months Total Last month 3 months 12 months Total
A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem 0 0 0 19 0 0 0 47
A Nearest Neighbour extension to project duration forecasting with Artificial Intelligence 0 0 6 22 2 2 9 68
A buffer control method for top-down project control 0 0 2 13 0 0 5 49
A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem 0 0 1 5 0 0 7 15
A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems 0 0 0 1 0 0 2 4
A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem 0 0 1 67 0 0 2 225
A hybrid scatter search heuristic for personalized crew rostering in the airline industry 0 0 0 22 0 2 3 99
A hybrid scatter search/electromagnetism meta-heuristic for project scheduling 0 0 0 22 0 0 0 99
A hybrid single and dual population search procedure for the job shop scheduling problem 0 0 0 13 0 0 0 51
A metaheuristic solution approach for the time-constrained project scheduling problem 0 0 0 6 0 0 1 43
A new algorithm for resource-constrained project scheduling with breadth and depth of skills 0 0 1 10 0 1 5 32
A new scheduling technique for the resource–constrained project scheduling problem with discounted cash flows 0 0 0 1 0 0 0 4
A parallel multi-objective scatter search for optimising incentive contract design in projects 0 0 0 2 0 0 0 13
A perturbation matheuristic for the integrated personnel shift and task re-scheduling problem 0 0 0 5 0 0 2 24
A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem 0 0 1 3 0 0 2 11
A resource type analysis of the integrated project scheduling and personnel staffing problem 0 0 1 7 0 0 5 38
A scatter search for the extended resource renting problem 0 0 0 0 0 0 0 2
A simulation and evaluation of earned value metrics to forecast the project duration 0 0 1 12 0 0 6 29
A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs 0 0 2 8 0 2 5 41
An Exact Procedure for the Resource-Constrained Weighted Earliness–Tardiness Project Scheduling Problem 0 0 0 5 0 0 1 15
An approach using SAT solvers for the RCPSP with logical constraints 0 0 2 17 0 0 5 63
An evaluation of the adequacy of project network generators with systematically sampled networks 0 0 1 55 1 1 8 156
An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances 0 0 2 33 1 1 6 103
An integrated nurse staffing and scheduling analysis for longer-term nursing staff allocation problems 0 0 1 165 0 0 5 556
Analyzing the nursing organizational structure and process from a scheduling perspective 0 0 0 16 0 0 0 82
Capital- and resource-constrained project scheduling with net present value optimization 0 0 1 27 0 0 1 92
Comparison and hybridization of crossover operators for the nurse scheduling problem 0 0 0 1 1 1 5 11
Decomposition-based heuristics for the integrated physician rostering and surgery scheduling problem 0 0 0 1 0 0 1 2
Discrete time/cost trade-offs in project scheduling with time-switch constraints 0 0 0 1 0 0 0 5
Diversity in Resource Consumption Patterns and Robustness of Costing Systems to Errors 0 0 0 5 0 0 0 30
Incentive contract design for projects: The owner׳s perspective 0 0 1 9 0 0 1 64
Maximising the weighted number of activity execution modes in project planning 0 0 0 4 0 0 1 19
Mode generation rules to define activity flexibility for the integrated project staffing problem with discrete time/resource trade-offs 0 0 0 3 0 0 2 14
Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers 0 0 2 63 1 3 12 258
Multi-project scheduling: A benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates 0 0 5 13 1 3 11 23
Multimode time-cost-robustness trade-off project scheduling problem under uncertainty 0 0 0 0 0 0 1 2
New computational results for the discrete time/cost trade-off problem with time-switch constraints 0 0 1 11 1 1 2 67
New summary measures and datasets for the multi-project scheduling problem 0 0 0 3 0 0 0 6
On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints 0 0 0 29 0 1 1 80
On the characterization and generation of nurse scheduling problem instances 0 0 1 50 0 0 2 189
On the design of custom packs: grouping of medical disposable items for surgeries 0 0 3 5 0 1 9 16
On the dynamic use of project performance and schedule risk information during projecttracking 1 1 1 43 1 1 3 153
On the use of multivariate regression methods for longest path calculations from earned value management observations 0 0 1 6 0 1 2 39
Operating theatre modelling: integrating social measures 0 0 0 0 0 0 0 0
Optimised scheduling for weather sensitive offshore construction projects 0 0 2 24 1 1 4 65
Practical application of reference class forecasting for cost and time estimations: Identifying the properties of similarity 0 1 8 19 0 1 18 57
Progress payments in project scheduling problems 0 1 1 15 0 1 1 68
Project schedule performance under general mode implementation disruptions 0 0 0 4 0 0 1 12
Reconstructing nurse schedules: Computational insights in the problem size parameters 0 0 0 11 0 0 1 40
Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling 0 0 3 19 0 1 10 63
Setting tolerance limits for statistical project control using earned value management 0 0 1 18 0 0 3 87
Strategies for project scheduling with alternative subgraphs under uncertainty: similar and dissimilar sets of schedules 0 0 0 9 0 0 1 64
The bilevel optimisation of a multi-agent project scheduling and staffing problem 0 0 1 2 0 0 3 15
The impact of a limited budget on the corrective action taking process 0 0 0 4 0 0 1 27
The impact of applying effort to reduce activity variability on the project time and cost performance 0 1 2 7 0 1 5 46
The impact of incorporating nurse-specific characteristics in a cyclical scheduling approach 0 0 1 3 0 0 1 9
Using Earned Value Management and Schedule Risk Analysis with resource constraints for project control 1 2 8 22 1 4 14 50
Using Schedule Risk Analysis with resource constraints for project control 0 0 2 13 0 0 8 47
Using activity sensitivity and network topology information to monitor project time performance 0 0 1 36 0 0 3 147
Various extensions in resource-constrained project scheduling with alternative subgraphs 0 0 0 0 0 1 2 3
Work Continuity Optimization for the Westerscheldetunnel Project in the Netherlands 0 0 0 8 0 0 0 61
Total Journal Articles 2 6 68 1,017 11 31 209 3,800
1 registered items for which data could not be found


Book File Downloads Abstract Views
Last month 3 months 12 months Total Last month 3 months 12 months Total
Integrated Project Management Sourcebook 0 0 0 0 1 2 3 15
Integrated Project Management and Control 0 0 0 0 1 1 2 19
Measuring Time 0 0 0 0 0 0 0 13
Project Management with Dynamic Scheduling 0 0 0 0 0 2 7 16
Project Management with Dynamic Scheduling 0 0 1 1 2 6 19 32
The Data-Driven Project Manager 0 0 0 0 0 0 1 6
Total Books 0 0 1 1 4 11 32 101


Chapter File Downloads Abstract Views
Last month 3 months 12 months Total Last month 3 months 12 months Total
A Case Study 0 0 0 0 0 0 0 2
A Simulation Study 0 0 0 0 0 0 0 1
Advanced Topics 0 0 0 0 0 0 0 2
Advanced Topics 0 0 0 0 0 0 0 3
Beyond the EVM Fundamentals 0 0 0 0 0 0 0 0
Conclusions 0 0 0 0 0 0 0 1
Conclusions 0 0 0 0 0 0 0 0
Conclusions 0 0 0 0 0 0 0 1
Conclusions 0 0 0 0 0 0 0 1
Critical Chain/Buffer Management 0 0 0 0 0 0 0 1
Critical Chain/Buffer Management 0 0 0 0 0 0 0 1
Dynamic Scheduling with ProTrack 0 0 0 0 0 0 1 4
Dynamic Scheduling with ProTrack 0 0 0 0 0 0 1 2
Earned Schedule 0 0 0 0 0 0 0 0
Earned Value Management 0 0 0 0 1 2 12 22
Earned Value Management 0 0 1 1 0 1 3 11
Earned Value Management 0 0 0 0 0 0 1 9
Forecasting 0 0 0 0 0 0 0 5
Generalized Discrete Time-Cost Tradeoff Problems 0 0 0 0 0 0 0 1
Heuristic Methods for the Resource Availability Cost Problem 0 0 0 0 0 1 2 6
Introduction 0 0 1 1 0 1 2 3
Introduction 0 0 0 0 0 0 0 0
P2 Engine 0 0 0 0 0 0 18 47
ProTrack 0 0 0 0 0 0 0 31
ProTrack: A Software Tutorial 0 0 0 0 0 2 17 35
Project Data 0 0 0 0 0 0 1 4
Resource-Constrained Project Scheduling 0 0 0 0 0 0 0 2
Resource-Constrained Project Scheduling 0 0 0 0 0 1 2 9
Resource-Constrained Scheduling Extensions 0 0 0 0 0 0 0 3
Resource-Constrained Scheduling Extensions 0 0 0 0 0 0 0 0
Schedule Adherence 0 0 0 0 0 0 0 6
Schedule Control 0 0 0 1 0 0 2 4
Schedule Risk 0 0 0 0 0 0 1 6
Schedule Risk Analysis 0 0 0 0 0 1 2 3
Schedule Risk Analysis 0 0 0 0 0 0 3 7
The Critical Path Method 0 0 0 0 0 0 1 3
The Critical Path Method 0 0 0 0 0 1 6 11
The EVM Fundamentals 0 0 0 0 0 0 0 0
The Multi-Mode Resource-Constrained Project Scheduling Problem 0 0 0 0 0 1 9 19
The Mutum-Paraná II Bridge Project (A) 0 0 0 0 0 1 19 41
The Mutum-Paraná II Bridge Project (A) 0 0 0 0 0 0 8 17
The Mutum-Paraná II Bridge Project (B) 0 0 0 0 0 0 1 3
The Mutum-Paraná II Bridge Project (B) 0 0 0 0 0 0 1 5
The Mutum-Paraná II Bridge Project (C) 0 0 0 0 0 0 2 5
The Mutum-Paraná II Bridge Project (C) 0 0 0 0 0 0 0 4
The PERT/CPM Technique 0 0 1 1 1 1 7 13
The PERT/CPM Technique 0 0 0 0 0 0 3 7
The VMW Project 0 0 0 0 0 0 8 18
The VMW Project 0 0 0 1 0 0 7 9
The Westerschelde Tunnel Project 0 0 0 0 0 0 0 3
The Westerschelde Tunnel Project 0 0 0 0 0 0 1 1
Time Sensitivity 0 0 0 0 0 0 0 2
Top-down or Bottom-up Project Tracking 0 0 0 0 0 0 1 1
Total Chapters 0 0 3 5 2 13 142 395


Statistics updated 2024-09-04